中山市东河水利枢纽工程由于不能采用全截流围堰施工,受场地限制,船闸必须建在河边,施工难度很大。介绍船闸闸室结构设计及施工,着重说明桩基础的计算和施工中遇到的一些问题,并对基桩的水平承载力试验成果进行了统计分析。
Due to the fact that Donghe River Water Control Project in Zhongshan City can not be constructed with a full closure cofferdam, the ship lock must be built at the riverside and the construction is very difficult. This paper introduces the design and construction of ship lock chamber structure, emphasizes some problems encountered in the calculation and construction of pile foundation, and makes statistical analysis on the test results of horizontal bearing capacity of foundation piles.