论文部分内容阅读
2011年10月30~31日,水利水电规划设计总院在北京主持召开《重力坝设计规范英文翻译》及《水利水电工程物探规程英文翻译》(报批稿)体例格式定稿会。参加会议的有水利部国际合作与科技司、中国水利水电科学研究院、长江水利委员会长江勘测规划设计研究院、水利水电快报、中国水电顾问集团北
From October 30 to 31, 2011, the General Planning and Design Institute of Water Conservancy and Hydropower hosted the final draft of the format of English Translation of Gravity Dam Design Code and English Translation of Geophysical Provisions of Water Resources and Hydropower Engineering Project in Beijing. The meeting was attended by ministries of International Cooperation and Science and Technology, Ministry of Water Resources, China Institute of Water Resources and Hydropower Research, Yangtze River Survey and Planning Institute of Yangtze River Water Conservancy, Water Resources and Hydropower Express, China Hydropower Consultants Group North