论文部分内容阅读
(上接本于111998年第5期第13页)3自动化监测系统设计根据本次更新改造的设计原则及大化水电厂对更新改造的具体要求,决定在观测系统更新改造过程中尽可能将各监测项目实现自动化遥测。3.1自动化监测系统的总体方案3.1.1自动化监测项目的选择选择更新改造后的全部垂线、引
(上 接 本 第 111998 第 5 页 第 13 页) 3 Design of Automation Monitoring System According to the design principles of this renovation and transformation of Dahua hydropower plant on the specific requirements of the transformation and modernization, decided to upgrade the observation system as much as possible The monitoring project to achieve automated telemetry. 3.1 The overall program of automated monitoring system 3.1.1 The choice of automation monitoring project to choose all the normal post-transformation, cited