论文部分内容阅读
1.国家大剧院已于2002年底实现主体结构封顶 被称为“中国第一艺术殿堂”的中国国家大剧院地下结构部分于2002年7月底全面完工,2002年底已实现主体结构封顶。 国家大剧院由法国著名建筑师保罗·安德鲁主持设计。作为中国最高的表演艺术中心,国家大剧院位于人民大会堂西侧、北京的心脏地区。总建筑面积约16.5万平方米,其中主体建筑10.5万平方米、地下附属设施6万平方米。国家大剧院由歌剧院、音乐厅、戏剧场、小剧场及相应的配套设施组成。
1. National Center for the Performing Arts at the end of 2002 to achieve the main structure of the cap The so-called “China’s first art palace,” the Chinese National Grand Theater, the underground structure was fully completed by the end of July 2002, by the end of 2002 to achieve the main structure cap. The National Grand Theater is presided over by the famous French architect Paul Andrew. As the highest performing arts center in China, the National Grand Theater is located in the heart of Beijing on the west side of the Great Hall of the People. The total construction area of about 165,000 square meters, of which 105,000 square meters main building, underground facilities 60,000 square meters. The National Grand Theater consists of an opera house, a concert hall, a theater, a small theater and corresponding supporting facilities.