论文部分内容阅读
能源行业核电标准化技术委员会秘书处于2014年7月10日~11日,在北京组织召开了核电标准的审查会。本次会议审查了由哈尔滨汽轮机厂有限责任公司主编的《核电厂汽轮机转子设计制造规范第1部分:整锻转子》、《核电厂汽轮机转子设计制造规范第2部分:套装转子》和《核电厂汽轮机转子设计制造规范第3部分:焊接转子》3项标准。来自上海发电设备成套设计研究院、中国核电工程有限公司、上海核工程研究设计院等8家单位的18位专家和代表参会。
The Secretariat of the Nuclear Power Standardization Technical Committee of the Energy Industry organized a review meeting of nuclear power standards in Beijing from July 10 to 11, This meeting examined the “Code for Design and Manufacture of Turbine Rotors of Nuclear Power Plants Part 1: Roughing Rotors”, “Part 2: Design and Manufacturing of Turbine Rotors for Nuclear Power Plants” and “Nuclear Power Plant” edited by Harbin Turbine Works Co., Turbine rotor design and manufacturing specifications Part 3: Welding rotor "3 criteria. 18 experts and representatives from 8 units of Shanghai Power Generation Equipment Design and Research Institute, China Nuclear Power Engineering Co., Ltd. and Shanghai Nuclear Engineering Research and Design Institute attended the meeting.