丹东港大东港区,自1982年可行性研究以来于88年7月建成3#泊位投入营运生产,目前进港铁路已建成并投入运行;到1994年又将有三万吨级泊位交付使用,1993年6月14日下午15时30分“辽民一号” 客轮满载300余名乘客从大东港启程,踢波踏浪驶向山东烟台,从此结束了丹东市区50余年不通海上客运的历史,为更好掌握利用当地潮汐规律和气象条件,充分发挥大东港码头的利用率,增加经济效益,特撰本文供有关部门参考。
Dandong Port Dadong Port has been put into operation since July 1982, after the feasibility study was completed in July 88. At present, the incoming railway has been completed and put into operation. By 1994, another 30,000-ton berth will be delivered and used, and 1993 On June 14, at 15:30 on the afternoon of the 14th, “Liao Min One” passenger ship loaded with more than 300 passengers departed from Dadonggang and kicked the waves to Yantai, Shandong Province, ending the Dandong urban area for more than 50 years. History, in order to better grasp the use of local tidal rules and weather conditions, give full play to the utilization of Dadong Port Terminal, increase economic efficiency, essay for reference of relevant departments.