一、现状及存在的主要问题黄河三盛公引水枢纽总干渠电站跌水节制闸(以下简称跌水闸)位于总干渠进水闸下3.3公里,全闸分四孔,每孔净宽10米,其设计水位与流量如表1所示。
I. Status quo and major problems existing The Yellow River Sanshenggu Water Diversion Project is located 3.3 km below the intake of the main canal, with four holes and a net width of 10 meters each. The designed water level Table 1 shows the traffic.