论文部分内容阅读
1978年6月,我省在某印刷厂工程中,利用盆式提升原理解决了升板法施工设备提升能力不足的问题。为了使这项新工艺实用方便,中国建研院结构所于1979年3月提出了用于盆式提升法的简化计算公式。同年4月,浙江省建筑设计院、浙江省建三公司在某四层丝绸仓库工程中(约10000平方米),完全按盆式提升法进行设计与施工,并于1980年8月提升完毕,情况良好。通过对升板在盆式提升和盆式搁置状态下的内
In June 1978, in the printing plant project of our province, the use of basin-type lifting principle solved the problem of inadequate lifting capacity of the lifting plate construction equipment. In order to make this new process practical and convenient, the China Institute for Construction Research Institute proposed in March 1979 a simplified calculation formula for the pot lift method. In April of the same year, the Architectural Design Institute of Zhejiang Province and the Zhejiang Jiansan Company in a four-story silk warehouse project (about 10,000 square meters) were completely designed and constructed according to the pot-type lifting method, and were upgraded in August 1980. In good condition. Through the lift plate in the basin lift and pot shelving condition