20 0 0年 8月 2 8日至 9月 1 8日 ,核工业无损检测中心对 1 0MW高温气冷实验堆 (HTR 1 0 )一回路压力边界部件———反应堆压力壳、蒸气发生器压力壳、热气导管压力壳及它们的支承件 ,进行了役前检查。国家核安全局北方站与清华大学核研院质保、设计人员进行了现场质量监?
From August 28, 2008 to September 18, 2008, the Nuclear Non-destructive Testing Center (NUCC) evaluated the pressure boundary components of the primary circuit of a 10MW High Temperature Gas-cooled Experimental Reactor (HTR10) --- the reactor pressure shell, the pressure of the steam generator Shell, hot gas conduit pressure shell and their support, conducted a pre-service inspection. National Nuclear Security Administration North Station and Tsinghua University Nuclear Research Institute of Warranty, the designer conducted a site quality supervision?