秦皇岛港煤四期工程是煤炭输出专用码头,其堆存场地的皮带机系统由日本三菱公司设计制造,平均每条胶带机长1300多m,每条皮带机额定作业能力为6000t/h。在配煤作业时,至少需要同时运行两条取料胶带机,而每条胶带机煤流量则较小。实测表明如果这时还将配置的电
Qinhuangdao Port Coal Phase IV Project is a special coal output terminal. The belt conveyor system of its storage site is designed and manufactured by Japan’s Mitsubishi Corporation. The average length of each tape machine is more than 1300 m and the rated working capacity of each belt conveyor is 6000 t / h. At coal blending operations, at least two pick-up tape feeders need to be run at the same time, and the coal flow per tape machine is smaller. Measured that if the electricity will be configured at this time