建筑工程施工中,GB 50242-2002《建筑给水排水及采暖工程施工质量验收规范》及DBJ14—032-2004《建筑工程施工工艺规程》中均对各种管线穿地下室剪力墙提出了明确要求:地下室或地下构筑物外墙有管道穿过的,应采取防水措施。对有严格防水要求的建筑物,必须采用柔性防水套管。在工程的实际应用中,各施工单位对管道穿越地下室剪力墙的防水套管,基本上都可按规范及图集要求施工,保证管道穿剪力
Construction projects, GB 50242-2002 “Building Water Supply and Drainage and Heating Engineering Construction Quality Acceptance Code” and DBJ14-032-2004 “Construction Engineering Construction Procedures” are on a variety of pipeline through the basement shear wall put forward specific requirements: Basement or underground structures have pipe through the outer wall, should take waterproofing measures. For buildings with strict waterproofing requirements, flexible waterproof sleeves must be used. In the practical application of the project, all waterproofing sleeves of pipelines passing through the basement shear walls can basically be constructed according to the requirements of the code and atlas, and ensure that the pipe is capable of penetrating and shearing