外墙装饰排版施工前必须使用BIM对外墙装饰进行综合排版,结合现场测量的结果提出最优调整方案,偏差大则需对排版尺寸进行调整,由设计单位向业主单位协商提出变更,经业主确认后进行实施。基层要求基层抹灰层不起泡,不掉砂,抹灰质量达到中级抹灰标准。2m靠尺检查,控制在4mm以内此时平整度符合要求,基层阴阳角直线度用2m靠尺测量,露缝间隙小于5mm。
Exterior wall decoration layout Before construction, the exterior wall decoration must be typeset comprehensively by using BIM. Based on the result of field measurement, the optimal adjustment plan is proposed. If the deviation is large, the layout size should be adjusted. The design unit shall make a change to the owner unit and confirm with the owner After the implementation. Grassroots level grass-roots plaster does not require foaming, sand-free, plaster quality to mid-level plastering standards. 2m by foot inspection, control within 4mm at this time to meet the requirements of flatness, grassroots yin and yang straightness measured by 2m by foot, exposed gap less than 5mm.