一、监测、监控项目及应用 1.人员跟踪定位系统该项目解决了入井人员由入井时的主动打卡方式转变为自动记录方式,减少了入井手续和员工负担,由井口监测深入到井下采区现场监测(定位)。人员跟踪定位系统在矿井的部署按照投资规模、重点范围和场所予以实施。在开元矿建设中对涉及主井、副井、皮带巷等8个巷道,6个采煤、综采、掘进面,共计安装了21个分
I. MONITORING AND MONITORING PROJECT AND ITS APPLICATION 1. Personnel Tracking and Positioning System This project has solved the problem that the personnel entering into the well is changed from the active punching mode into the automatic recording mode when entering the well and the procedures for entering into the well and the staff are reduced. Monitoring (positioning). Personnel tracking and positioning system in the deployment of the mine in accordance with the investment scale, focus scope and place to be implemented. In the construction of Kaiyuan Mine, there are 8 tunnels, including 6 main shaft, auxiliary shaft, belt lane, 6 coal mining, fully mechanized mining and driving face, and a total of 21 points