论文部分内容阅读
一概述 在电厂的建设中,由于设备的庞大复杂,厂房的建筑也相应地造得非常高大。而现代的电厂,大部份的设备都具有自动化的装置,生产人员少,活动的范围也比较小,过大的厂房便显得很不合理。近年来在苏联及其他国家对发电厂的露天布置进行了一系列的研究,并取得了一定的经验。我国大部份地区处于温带,气候良好,因此特别适宜于露天电厂的建设。我们在杭州电厂的建设中,遵照上级的指示,按露天式布置,进行了试点设计,以便取得—些经验后,在今后工程中推广(该工程尚未建造)。
An Overview In the construction of a power plant, due to the large and complex equipment, the construction of the factory building was correspondingly very large. In modern power plants, most of the equipment is equipped with automated equipment. The number of production personnel is small and the range of activities is relatively small. Excessively large plants are unreasonable. In recent years, the Soviet Union and other countries have conducted a series of research on the open-air arrangement of power plants and have obtained certain experience. Most parts of China are in temperate regions and have a good climate, and are therefore particularly suitable for the construction of open-air power plants. In the construction of the Hangzhou Power Plant, we followed the instructions of the superiors and arranged them in an open-air layout to carry out the pilot design so as to obtain some experience and promote it in future projects (the project has not yet been built).