近年来,随着我国经济社会的发展,投资规模不断扩大,建筑业迅猛发展,施工技术日趋复杂,科研人员通过对桩基施工的长期技术研究和施工经验总结,研制出后压浆灌注桩施工工艺方法,是采用高压注浆和灌注桩施工相结合的一种施工技术,施工要点是在钢筋混凝土灌注桩桩身强度达到设计强度的70%时,通过桩身预留的注浆管用压浆泵将水泥浆高压注入桩端或桩周,利用水泥浆液对桩身周边土层进行固结、填充、挤密,从而提高桩端、桩侧阻力,提高桩的竖向承载力、减少沉降量、降低工程造价。该方法的实施大大缩短了灌注桩的桩体,提高了施工团队的施工效率,也提高了施工团队的经济效益。本文就后压浆钢筋混凝土灌注桩施工质量关键质量控制点、难点进行分析,从成孔质量、注浆管预置、桩底沉渣厚度、注浆时间以及注浆参数(水灰比、注浆量、注浆压力)进行分析,并进行要因分析,最后针对影响要素提出了相应的应对措施。
In recent years, with the economic and social development in our country, the scale of investment continues to expand, the rapid development of construction industry, construction technology is becoming more and more complex, researchers through the pile foundation construction of long-term technical research and construction experience summary, development of post-grouting bored pile construction The method is a kind of construction technology which combines high-pressure grouting and bored pile construction. The construction point is that when the strength of the reinforced concrete bored pile body reaches 70% of the designed strength, the grouting pipe grouting reserved by the pile body, The pump injects high-pressure cement slurry into pile end or pile circumference, cement slurry is used to consolidate, fill and squeeze the soil around the pile to improve the resistance at pile end and pile side, increase the vertical bearing capacity of pile and reduce the settlement , Reduce project cost. The implementation of this method greatly shortened the pile of piles, improved the construction team’s construction efficiency and also improved the economic benefits of the construction team. In this paper, post-grouting reinforced concrete bored pile construction quality key control points, difficult to analyze, from the hole forming quality, grouting pipe preset, bottom sediment thickness, grouting time and grouting parameters (water-cement ratio, grouting Volume, grouting pressure) analysis, and analysis of the causes, and finally put forward the corresponding response measures for the impact of the elements.