论文部分内容阅读
(莆田市建设工程质量监督站 福建 莆田 351100)
【摘 要】斜屋面因其外形美观、排水顺畅不漏水而被广泛采用,但因楼层标高不一,模板、钢筋安装和砼浇筑等都有一定难度,技术要求高,作者通过参加一些斜屋面工程的监督工作,总结了施工技术要点,旨在抛砖引玉,以便今后更好地指导施工,提高斜屋面工程质量。
【关键词】斜屋面;防水层;装饰层;施工技术
Reinforced concrete inclined house surface construction technique
Chen Xia-wei
(Putian city construction engineering quality and inspect station Putian Fujian 351100)
【Abstract】inclined house surface because its shape beauty, drain smoothly gastight water but drive extensive adoption, but because the floor elevation is different, the template, reinforcing bar gearing and concrete sprinkle to build etc. s all have a certain difficulty and the technique has high request, the author discussed some direct work of inclined house surface engineeringses and tallies up the important point of construction technique, and the aim is to improve quality of inclined house project.
【Key words】Inclined house; Waterproof layer; Decoration layer; Construction technique
斜屋面因其外形美观、排水顺畅受到了广大人民群众的好评,在本地区得到了迅速的推广,我市城厢区梅园路改造工程大部分的临街房屋均全部或局部采用了斜屋面建筑设计方案,那高低错落线条交织的红色斜屋面凸现出独特的建筑风格,形成了一道亮丽的都市风景线,大大改善了城区的面貌。近几年来,在我站注册监督的龙辉花园商住楼、莆田市交通花园B#C#住宅楼、太平洋B幢及G幢住宅楼、荔园小区等工程,均采用了斜屋面造型设计,这些工程在广大的技术人员的精心施工后,工程质量过硬、观感较好。本人通过负责监督的莆田市交通花园B#住宅楼、荔园小区、龙辉花园的施工,总结了斜屋面工程施工的经验,在此简要探讨斜屋面工程的施工方法和技术要点。
1. 钢筋混凝土斜屋面的施工
1.1 模板及支撑系统
1.1.1 斜屋面模板搭设前必须先严格按图纸进行放样,施工中必须按设计标高定好坡度准确放线,为此,首先要按设计标高确定顶脊的水平线,准确划出各点与檐口各设计点相连划出坡脊线,以此依次将各局部屋面的顶脊、坡脊、边脊线组合划出;其次,检查各顶脊位置平衡标高,调整各边脊均匀坡度,使斜屋面各脊线规整顺直。柱与斜梁的几何尺寸必须预制准确,柱梁的空间位置必须安装到位,以保证脊线平齐顺直,屋顶主脊、屋面斜脊和边脊与檐口交接角度准确。这样才能使屋顶造型立体观感得到良好体现。
1.1.2 由于斜屋面的支撑高度和结构层自重均高于各平面楼层结构的支撑高度和结构自重,模板支撑系统必须有足够的稳定性,所用的材料必须有足够的刚度,要求模板支撑立柱及水平拉条要适当加密,水平大木楞应采用不小于截面规格60*90mm的松方木,支柱圆木小头直径不得小于80mm,且不得使用腐朽和有裂缝的圆木,支撑体系应进行必要的承载力和稳定性计算复核,支柱的水平拉条必须增设一道,确保支撑体系的稳定性。
1.1.3 本地区的模板一般采用整张大块多层胶合板,模板必须有足够的刚度,还要注意保证模板的平整度,接触混凝土面必须光洁并且涂刷隔离剂,鉴于保证斜屋面砼浇灌密实度是施工难点,施工中特别注意柱、主次梁节点及板面模板拼缝密实,以避免漏浆。
1.2 钢筋安装工程
1.2.1 斜屋面的钢筋铺设绑扎安装要求采取稳固钢筋措施,无论单向双向配筋都极易滚动脱落,必须采取相应措施加以控制。一般采用铁钉固定即可。斜屋面钢筋必须全数绑扎牢固,对容易受到踩踏的局部板面应采取反十字扣双股扎牢。
为了确保钢筋受力性能的发挥,斜屋面的钢筋混凝土保护层厚度必须严格控制在15mm。对于板底钢筋,一般要求加垫水泥浆预制块将板底钢筋均匀垫起,但当垫块间距大于1.5米时,钢筋网的合理保护层厚度就无法保障,所以纵横向的垫块间距控制在1米左右为好。
1.2.2 除了板面的负筋,由于现在推行在屋面板负筋覆盖不到的区域中加设温度受力钢筋的设计要求,实际上在屋面板中形成双面钢筋。由于板的上层钢筋一般较细较软,受到人员踩踏后就立即弯曲、变形、下坠,为了确保上层钢筋安装准确且在施工中始终保持正确的安装位置,必须要对双层筋或负筋部位加设铁马蹬或“工”形混凝土垫块,防止其下陷和踩踏变形,保证其保持合理的保护层,根据大量的施工实践,要求铁马蹬或混凝土垫块其纵横向间距不应大于700mm(即每平方米不得少于2只),特别是对于6~8钢筋,其间距应控制在500~600毫米以内(即每平方米不得少于3只)。
(3)钢筋安装后必须注意保护,严禁混凝土运输跳板直接安置在钢筋上,应搭设混凝土运输接站在板面模板上,且应注意避免施工机具直接冲击板面钢筋而造成其变形。
1.3混凝土工程的施工
1.3.1 根据现行的设计规范,现浇屋面板面的混凝土要具有一定的抗渗要求,一般选用抗渗混凝土,为确保混凝土拌制质量,对骨料的要求应更为严格,砂子应为中砂且含泥量不得超过5%,碎石粒径以5-30mm为宜且含泥量不得大于2%,骨料级配要合理,以增加混凝土的和易性。根据施工经验,要严格控制混凝土的水灰比,混凝土的坍落度以10-15cm左右为宜。
1.3.2 斜屋面尤其是陡斜屋面的混凝土浇筑,最大的问题是混凝土滑动流淌造成局部离析而发生混凝土的质量问题,浇灌时混凝土倾落高度不大于600mm,因此不能从跳板上直接从高处向下倾倒砼,砼浇灌时增加板面作业工人,特别在屋面低处浇灌砼时,建议全部用小桶水平运输混凝土(禁止用斗车),一小桶一小桶平铺,这样可避免作业工人施工中贪图容易,盲目倾倒砼,造成砼离析。
1.3.3 砼浇灌时应从屋面两头最低处同时开始,两面坡面同时浇注为佳,混凝土的浇筑应连续施工不留置施工缝。如特殊情况必须留置施工缝时,施工缝的位置应在结构受力较小处,一般距现浇板支座1m,不可在现浇板中心部位置留置施工缝。
1.3.4 斜屋面的混凝土振捣密实一直是一个施工难题,为控制板的浇灌厚度,应在板面按1000×1000均匀布置厚度控制点。根据经验认为,对于梁的振捣要特别注意插式振动器振捣在各区段均匀,振捣时间过长易造成局部粗骨料集中,砂浆与粗骨料分离。对于板面混凝土,振捣过多混凝土易流动,造成板面平整度难以控制,一般做法是在施工中先用人工均匀摊铺混凝土,注意混凝土厚度应足够,用抹子拍实,待混凝土接近初凝时用平板振动器按板块的浇灌顺序均匀走二遍,接茬处则应多走一遍即可,板面振捣后再用人工对局部不平整及板厚度不足的板面进行修整,然后用水泥砂浆对板面混凝土表面修整,以取得良好的表面观感。
1.3.5 混凝土浇筑完成后要做好浇水养护,由于本地区夏季气温高,水份蒸发量大,斜屋面浇水养护效果差,因此夏季施工后应强调使用草袋覆盖养护为佳,以防止混凝土因暴晒而碳化和缩水龟裂,浇水湿润养护不得少于14天。
2. 屋面防水层施工
2.1 屋面防水层下的找平层施工。
根据现行的省标准图集,屋面找一般采用20厚1:2.5水泥浆找平层,施工前应做好抄平放线,并剔除砼表面浮石、杂质,清洗并充分湿润砼表面,在施工中找平层水泥浆应采用防水砂浆的配合比,以适当提高找平层的防水性能,找平层遇阴阳角处表面应做弧形找平处理,要按图集做法要求设分格缝,层面纵横分隔缝的间距一般不得大于6m×6m,在屋面转折处、防水层与突出屋面的交接处应加设,并用建筑油膏嵌缝饱满。屋面找平层施工后也应浇水养护或覆膜养护。
2.2 屋面防水层的施工要点。
在此探讨屋面防水层采用SBS改性沥青卷材和聚氨酯系列防水涂膜的施工方法和技术要点。2.2.1 SBS高聚物改性沥青防水卷材防水层施工技术要点。
SBS高聚物改性沥青防水卷材按其胎质分为聚酯布胎和玻璃布胎卷材,施工前要制定铺设方案,根据卷材的幅宽和长度计算剪裁尺寸方可进行剪裁。注意计算剪裁尺寸时要考虑卷材搭接宽度,以便卷材之间进行热熔焊接。采用半自动化热熔焊接机时,卷材焊缝尺寸(搭接宽度)应不小于50mm;使用手持温控热熔焊枪时,卷材搭接宽度应不小于100mm。
卷材接缝焊接时,不得损坏非焊接部位的卷材,焊接部位的卷材要保持干净,用热风机将上下两层卷材实施热粘,再用砂轮打毛机将焊接处打毛,然后以手持温控热熔焊接枪将上下层卷材焊牢。若使用半自动化温控热熔焊机(适于大面积平面铺设)焊接卷材搭接缝,则施工效要高、铺设速度快。
对檐沟、变形缝及分隔缝等关键部位,要按图集要求加设一道卷材防水层。 卷材收头处理是防水层质量关键所在,卷材周边收头不严,就容易造成渗漏,那时整体防水层失效,后果严重。因之必须一丝不苟地做好卷材收头处理这一工序。 凡在端头处(与搭接卷材焊接者牙算)必须先实行先固定、再密封、后覆盖的做法。卷材收头固定可用水泥钉钉防腐木条固定;也可采用铝合金压条压紧、射钉固定。收头处应严格按图集要求做好构造处理,通常应适宜地依附结构型式按照图集做好各种泛水处理。完工的焊缝应对严密性检查,发现焊缝质量问题或漏焊,应及时采取补救措施。
2.2.2 涂膜防水层的施工技术要点。
涂膜防水层一般设计要求不得少于2mm,对屋面防水层则一般设计 要求为3mm,涂刷涂膜防水层时,涂刷的顺序应地先垂直面,后水平面;先阴阳角,细部后大面,而且每一道涂膜防水的涂刷顺序都应相互垂直。对檐沟、变形缝及分隔缝等关键部位,要按图集要求要增加一道增强涂布或玻璃丝布,特殊部位如阴阳角处水泥砂浆圆弧处,也要附加防水层。
涂刷涂膜防水层时要待前一层涂膜固化干燥后进行,并应先检查其上有无残留的气孔或气泡。平面或坡面施工后在防水层未固化前不应踩踏,涂抹过程中要留出施工退路,或采用分区,分片后退法施工;
在第一遍涂膜固化24小时后,对所涂膜的空鼓、气孔、砂、卷进涂料的灰尘、涂层伤痕和固化不良等进行修补后涂刷第二遍涂料,涂膜方向与第一遍方向垂直,厚度控制在0.7mm左右,涂膜顺序同样要求先立面后平面。以后各遍涂膜都必须在前一遍涂膜固化24小时后在进行施工,厚度应控制在0.7mm左右,直至涂膜总厚度达到设计要求。
2.2.3 屋面防水层施工完成后,应做好保护措施,避免人员、施工材料、机具对其造成伤害,造成防水层破损,进而影响防水效果。对于出屋面的各种管道及构筑物,其与屋面的交接处均应做好水泥砂浆弧角找平,并做好防水层的反口和收口处理。
3. 屋面彩瓦装饰层的施工要点
英红瓦是一种新型的屋面饰面材料,由于施工方便、色彩艳丽、美观大方而在近几年得到了广泛的推广,此处谈英红瓦的施工要点。
按屋面坡长,算出列数,根据瓦片的规格,计算出上下搭接的距离,进行放线,纵向放线,按照屋面长度,算出所需要铺瓦的垄数,若到最后出现不够一整垄瓦时,应用脊瓦予以收口。完成以上程序后,就可以铺瓦了。铺瓦顺序为先下后上、从左到右。铺瓦时先均匀摊铺水泥砂浆,砂浆厚度应略厚,再把瓦放在上面,轻轻挤压,使瓦与灰浆完全结合,且瓦内砂浆应充分饱满,各垄的瓦铺设时,要使前后摊铺的砂浆层结合良好,使其形成一个整体的砂浆层,以提高其隔水性能。坡度一般在30°以内的斜屋面可直接铺设在防水层,或在瓦片下面的砂浆内放一层铁丝网,使灰浆和瓦片与屋面连成整体;屋面坡道超过30°时,瓦片应固定在砼屋面上,用胀膨螺丝和钢筋组成挂瓦系统,在铺瓦时将其用22#钢丝将其固定。
英红瓦屋面的屋脊、临边处理比较简单。与山墙时瓦屋面面层直接靠在墙边即可,临边及屋脊处的脊瓦铺贴要注意铺贴均匀,斜度、高度一致,以形成美观的线条。
瓦屋面施工后一定要注意成品保护,所铺完的瓦块不密实或未达到强度的瓦屋面,决不可上人踩踏。必须踩踏屋面时必须采取对瓦块的保护措施,防止瓦屋面局部承受集中荷载。另外,对铺完瓦的屋面要随时清理,对屋面的檐口、脊边、泛水等处必须做好细部处理,使之达到严密、顺直、平整、清晰、美观。
4. 结束语
钢筋砼斜屋面作为一种新型的建筑设计形式,在施工技术上比平屋面有一定的技术难点,在施工过程中,针对这些技术难点,严格按施工规范的要求,做好施工技术方案,并在施工中认真加以实施,就能高质量地完成斜屋面工程的施工。
参考文献
[1] GB50204-2002《混凝土结构工程施工质量验收规范》[S]
[2] GB50207-2002《屋面工程质量验收规范》 [S]
【摘 要】斜屋面因其外形美观、排水顺畅不漏水而被广泛采用,但因楼层标高不一,模板、钢筋安装和砼浇筑等都有一定难度,技术要求高,作者通过参加一些斜屋面工程的监督工作,总结了施工技术要点,旨在抛砖引玉,以便今后更好地指导施工,提高斜屋面工程质量。
【关键词】斜屋面;防水层;装饰层;施工技术
Reinforced concrete inclined house surface construction technique
Chen Xia-wei
(Putian city construction engineering quality and inspect station Putian Fujian 351100)
【Abstract】inclined house surface because its shape beauty, drain smoothly gastight water but drive extensive adoption, but because the floor elevation is different, the template, reinforcing bar gearing and concrete sprinkle to build etc. s all have a certain difficulty and the technique has high request, the author discussed some direct work of inclined house surface engineeringses and tallies up the important point of construction technique, and the aim is to improve quality of inclined house project.
【Key words】Inclined house; Waterproof layer; Decoration layer; Construction technique
斜屋面因其外形美观、排水顺畅受到了广大人民群众的好评,在本地区得到了迅速的推广,我市城厢区梅园路改造工程大部分的临街房屋均全部或局部采用了斜屋面建筑设计方案,那高低错落线条交织的红色斜屋面凸现出独特的建筑风格,形成了一道亮丽的都市风景线,大大改善了城区的面貌。近几年来,在我站注册监督的龙辉花园商住楼、莆田市交通花园B#C#住宅楼、太平洋B幢及G幢住宅楼、荔园小区等工程,均采用了斜屋面造型设计,这些工程在广大的技术人员的精心施工后,工程质量过硬、观感较好。本人通过负责监督的莆田市交通花园B#住宅楼、荔园小区、龙辉花园的施工,总结了斜屋面工程施工的经验,在此简要探讨斜屋面工程的施工方法和技术要点。
1. 钢筋混凝土斜屋面的施工
1.1 模板及支撑系统
1.1.1 斜屋面模板搭设前必须先严格按图纸进行放样,施工中必须按设计标高定好坡度准确放线,为此,首先要按设计标高确定顶脊的水平线,准确划出各点与檐口各设计点相连划出坡脊线,以此依次将各局部屋面的顶脊、坡脊、边脊线组合划出;其次,检查各顶脊位置平衡标高,调整各边脊均匀坡度,使斜屋面各脊线规整顺直。柱与斜梁的几何尺寸必须预制准确,柱梁的空间位置必须安装到位,以保证脊线平齐顺直,屋顶主脊、屋面斜脊和边脊与檐口交接角度准确。这样才能使屋顶造型立体观感得到良好体现。
1.1.2 由于斜屋面的支撑高度和结构层自重均高于各平面楼层结构的支撑高度和结构自重,模板支撑系统必须有足够的稳定性,所用的材料必须有足够的刚度,要求模板支撑立柱及水平拉条要适当加密,水平大木楞应采用不小于截面规格60*90mm的松方木,支柱圆木小头直径不得小于80mm,且不得使用腐朽和有裂缝的圆木,支撑体系应进行必要的承载力和稳定性计算复核,支柱的水平拉条必须增设一道,确保支撑体系的稳定性。
1.1.3 本地区的模板一般采用整张大块多层胶合板,模板必须有足够的刚度,还要注意保证模板的平整度,接触混凝土面必须光洁并且涂刷隔离剂,鉴于保证斜屋面砼浇灌密实度是施工难点,施工中特别注意柱、主次梁节点及板面模板拼缝密实,以避免漏浆。
1.2 钢筋安装工程
1.2.1 斜屋面的钢筋铺设绑扎安装要求采取稳固钢筋措施,无论单向双向配筋都极易滚动脱落,必须采取相应措施加以控制。一般采用铁钉固定即可。斜屋面钢筋必须全数绑扎牢固,对容易受到踩踏的局部板面应采取反十字扣双股扎牢。
为了确保钢筋受力性能的发挥,斜屋面的钢筋混凝土保护层厚度必须严格控制在15mm。对于板底钢筋,一般要求加垫水泥浆预制块将板底钢筋均匀垫起,但当垫块间距大于1.5米时,钢筋网的合理保护层厚度就无法保障,所以纵横向的垫块间距控制在1米左右为好。
1.2.2 除了板面的负筋,由于现在推行在屋面板负筋覆盖不到的区域中加设温度受力钢筋的设计要求,实际上在屋面板中形成双面钢筋。由于板的上层钢筋一般较细较软,受到人员踩踏后就立即弯曲、变形、下坠,为了确保上层钢筋安装准确且在施工中始终保持正确的安装位置,必须要对双层筋或负筋部位加设铁马蹬或“工”形混凝土垫块,防止其下陷和踩踏变形,保证其保持合理的保护层,根据大量的施工实践,要求铁马蹬或混凝土垫块其纵横向间距不应大于700mm(即每平方米不得少于2只),特别是对于6~8钢筋,其间距应控制在500~600毫米以内(即每平方米不得少于3只)。
(3)钢筋安装后必须注意保护,严禁混凝土运输跳板直接安置在钢筋上,应搭设混凝土运输接站在板面模板上,且应注意避免施工机具直接冲击板面钢筋而造成其变形。
1.3混凝土工程的施工
1.3.1 根据现行的设计规范,现浇屋面板面的混凝土要具有一定的抗渗要求,一般选用抗渗混凝土,为确保混凝土拌制质量,对骨料的要求应更为严格,砂子应为中砂且含泥量不得超过5%,碎石粒径以5-30mm为宜且含泥量不得大于2%,骨料级配要合理,以增加混凝土的和易性。根据施工经验,要严格控制混凝土的水灰比,混凝土的坍落度以10-15cm左右为宜。
1.3.2 斜屋面尤其是陡斜屋面的混凝土浇筑,最大的问题是混凝土滑动流淌造成局部离析而发生混凝土的质量问题,浇灌时混凝土倾落高度不大于600mm,因此不能从跳板上直接从高处向下倾倒砼,砼浇灌时增加板面作业工人,特别在屋面低处浇灌砼时,建议全部用小桶水平运输混凝土(禁止用斗车),一小桶一小桶平铺,这样可避免作业工人施工中贪图容易,盲目倾倒砼,造成砼离析。
1.3.3 砼浇灌时应从屋面两头最低处同时开始,两面坡面同时浇注为佳,混凝土的浇筑应连续施工不留置施工缝。如特殊情况必须留置施工缝时,施工缝的位置应在结构受力较小处,一般距现浇板支座1m,不可在现浇板中心部位置留置施工缝。
1.3.4 斜屋面的混凝土振捣密实一直是一个施工难题,为控制板的浇灌厚度,应在板面按1000×1000均匀布置厚度控制点。根据经验认为,对于梁的振捣要特别注意插式振动器振捣在各区段均匀,振捣时间过长易造成局部粗骨料集中,砂浆与粗骨料分离。对于板面混凝土,振捣过多混凝土易流动,造成板面平整度难以控制,一般做法是在施工中先用人工均匀摊铺混凝土,注意混凝土厚度应足够,用抹子拍实,待混凝土接近初凝时用平板振动器按板块的浇灌顺序均匀走二遍,接茬处则应多走一遍即可,板面振捣后再用人工对局部不平整及板厚度不足的板面进行修整,然后用水泥砂浆对板面混凝土表面修整,以取得良好的表面观感。
1.3.5 混凝土浇筑完成后要做好浇水养护,由于本地区夏季气温高,水份蒸发量大,斜屋面浇水养护效果差,因此夏季施工后应强调使用草袋覆盖养护为佳,以防止混凝土因暴晒而碳化和缩水龟裂,浇水湿润养护不得少于14天。
2. 屋面防水层施工
2.1 屋面防水层下的找平层施工。
根据现行的省标准图集,屋面找一般采用20厚1:2.5水泥浆找平层,施工前应做好抄平放线,并剔除砼表面浮石、杂质,清洗并充分湿润砼表面,在施工中找平层水泥浆应采用防水砂浆的配合比,以适当提高找平层的防水性能,找平层遇阴阳角处表面应做弧形找平处理,要按图集做法要求设分格缝,层面纵横分隔缝的间距一般不得大于6m×6m,在屋面转折处、防水层与突出屋面的交接处应加设,并用建筑油膏嵌缝饱满。屋面找平层施工后也应浇水养护或覆膜养护。
2.2 屋面防水层的施工要点。
在此探讨屋面防水层采用SBS改性沥青卷材和聚氨酯系列防水涂膜的施工方法和技术要点。2.2.1 SBS高聚物改性沥青防水卷材防水层施工技术要点。
SBS高聚物改性沥青防水卷材按其胎质分为聚酯布胎和玻璃布胎卷材,施工前要制定铺设方案,根据卷材的幅宽和长度计算剪裁尺寸方可进行剪裁。注意计算剪裁尺寸时要考虑卷材搭接宽度,以便卷材之间进行热熔焊接。采用半自动化热熔焊接机时,卷材焊缝尺寸(搭接宽度)应不小于50mm;使用手持温控热熔焊枪时,卷材搭接宽度应不小于100mm。
卷材接缝焊接时,不得损坏非焊接部位的卷材,焊接部位的卷材要保持干净,用热风机将上下两层卷材实施热粘,再用砂轮打毛机将焊接处打毛,然后以手持温控热熔焊接枪将上下层卷材焊牢。若使用半自动化温控热熔焊机(适于大面积平面铺设)焊接卷材搭接缝,则施工效要高、铺设速度快。
对檐沟、变形缝及分隔缝等关键部位,要按图集要求加设一道卷材防水层。 卷材收头处理是防水层质量关键所在,卷材周边收头不严,就容易造成渗漏,那时整体防水层失效,后果严重。因之必须一丝不苟地做好卷材收头处理这一工序。 凡在端头处(与搭接卷材焊接者牙算)必须先实行先固定、再密封、后覆盖的做法。卷材收头固定可用水泥钉钉防腐木条固定;也可采用铝合金压条压紧、射钉固定。收头处应严格按图集要求做好构造处理,通常应适宜地依附结构型式按照图集做好各种泛水处理。完工的焊缝应对严密性检查,发现焊缝质量问题或漏焊,应及时采取补救措施。
2.2.2 涂膜防水层的施工技术要点。
涂膜防水层一般设计要求不得少于2mm,对屋面防水层则一般设计 要求为3mm,涂刷涂膜防水层时,涂刷的顺序应地先垂直面,后水平面;先阴阳角,细部后大面,而且每一道涂膜防水的涂刷顺序都应相互垂直。对檐沟、变形缝及分隔缝等关键部位,要按图集要求要增加一道增强涂布或玻璃丝布,特殊部位如阴阳角处水泥砂浆圆弧处,也要附加防水层。
涂刷涂膜防水层时要待前一层涂膜固化干燥后进行,并应先检查其上有无残留的气孔或气泡。平面或坡面施工后在防水层未固化前不应踩踏,涂抹过程中要留出施工退路,或采用分区,分片后退法施工;
在第一遍涂膜固化24小时后,对所涂膜的空鼓、气孔、砂、卷进涂料的灰尘、涂层伤痕和固化不良等进行修补后涂刷第二遍涂料,涂膜方向与第一遍方向垂直,厚度控制在0.7mm左右,涂膜顺序同样要求先立面后平面。以后各遍涂膜都必须在前一遍涂膜固化24小时后在进行施工,厚度应控制在0.7mm左右,直至涂膜总厚度达到设计要求。
2.2.3 屋面防水层施工完成后,应做好保护措施,避免人员、施工材料、机具对其造成伤害,造成防水层破损,进而影响防水效果。对于出屋面的各种管道及构筑物,其与屋面的交接处均应做好水泥砂浆弧角找平,并做好防水层的反口和收口处理。
3. 屋面彩瓦装饰层的施工要点
英红瓦是一种新型的屋面饰面材料,由于施工方便、色彩艳丽、美观大方而在近几年得到了广泛的推广,此处谈英红瓦的施工要点。
按屋面坡长,算出列数,根据瓦片的规格,计算出上下搭接的距离,进行放线,纵向放线,按照屋面长度,算出所需要铺瓦的垄数,若到最后出现不够一整垄瓦时,应用脊瓦予以收口。完成以上程序后,就可以铺瓦了。铺瓦顺序为先下后上、从左到右。铺瓦时先均匀摊铺水泥砂浆,砂浆厚度应略厚,再把瓦放在上面,轻轻挤压,使瓦与灰浆完全结合,且瓦内砂浆应充分饱满,各垄的瓦铺设时,要使前后摊铺的砂浆层结合良好,使其形成一个整体的砂浆层,以提高其隔水性能。坡度一般在30°以内的斜屋面可直接铺设在防水层,或在瓦片下面的砂浆内放一层铁丝网,使灰浆和瓦片与屋面连成整体;屋面坡道超过30°时,瓦片应固定在砼屋面上,用胀膨螺丝和钢筋组成挂瓦系统,在铺瓦时将其用22#钢丝将其固定。
英红瓦屋面的屋脊、临边处理比较简单。与山墙时瓦屋面面层直接靠在墙边即可,临边及屋脊处的脊瓦铺贴要注意铺贴均匀,斜度、高度一致,以形成美观的线条。
瓦屋面施工后一定要注意成品保护,所铺完的瓦块不密实或未达到强度的瓦屋面,决不可上人踩踏。必须踩踏屋面时必须采取对瓦块的保护措施,防止瓦屋面局部承受集中荷载。另外,对铺完瓦的屋面要随时清理,对屋面的檐口、脊边、泛水等处必须做好细部处理,使之达到严密、顺直、平整、清晰、美观。
4. 结束语
钢筋砼斜屋面作为一种新型的建筑设计形式,在施工技术上比平屋面有一定的技术难点,在施工过程中,针对这些技术难点,严格按施工规范的要求,做好施工技术方案,并在施工中认真加以实施,就能高质量地完成斜屋面工程的施工。
参考文献
[1] GB50204-2002《混凝土结构工程施工质量验收规范》[S]
[2] GB50207-2002《屋面工程质量验收规范》 [S]