论文部分内容阅读
针对转炉净化除尘系统运行周期短的问题,通过改善浊环水水处理,稳定一次除尘风机运行等措施,实现了净化系统长周期运行,提高了系统除尘能力,发挥了转炉产能。
Aiming at the problem of short running period of the converter dedusting system, the long-period operation of the decontamination system was realized through the measures of improving turbid-ring water treatment and stabilizing the operation of the primary dedusting fan, which improved the dust removal capability of the system and played a role in the converter capacity.