我矿是一个有70年开采历史的老矿山,也是第一个五年计划156项重点建设的工程之一,于1958年建成投产。全矿现有职工5127人,固定资产6691万元,其中生产设备1979台,重量3012t,占固定资产总值的25.2%。因此,加速设备更新改造,不断追求设备寿命周期费用的最佳效果,提高全矿的综合经济效益,是设备工作者的中心任务。近年来,我矿认真贯彻《有色金属工业设备管理试行条例》精神,在抓好现有设备管理的同时,有计划、有步骤、有重点地对陈旧、低
Mine is an old mine with 70 years of mining history and one of the 156 key construction projects of the first five-year plan. It was put into operation in 1958. Whole mine existing staff 5127, 66.91 million yuan in fixed assets, of which 1979 sets of production equipment, weighing 3012t, accounting for 25.2% of the total fixed assets. Therefore, accelerating the upgrading of equipment, the constant pursuit of equipment, the best cost-effective life cycle and improve the overall economic efficiency of the whole mine, the centerpiece of the equipment workers. In recent years, our mine conscientiously implement the “Nonferrous Metals Industry Equipment Management Trial Regulations,” the spirit of grasping the existing equipment management at the same time, a planned, step by step, with emphasis on obsolete, low