为了控制潼关高程,三门峡水库相继进行了改建并改变了运用方式,近几年又开展了清淤试验、河道裁弯取直工程试验,加大了潼关附近河段河道整治工程建设力度,进行了改变三门峡水库运用方式,降低潼关高程原型及模型试验等,取得了一定成果,使得潼关高程的抬升得到一定程度的控制。本文对包括改变三门峡水库运用方式、清淤挖河、河道整治等几种可能降低潼关高程的措施进行了初探,以供商榷。
In order to control the elevation of Tongguan, Sanmenxia Reservoir has been rebuilt and changed the way of operation. In recent years, dredging tests and straightening straightforward tests have been carried out to increase the construction of river courses near Tongguan, Change the way of Sanmenxia reservoir operation, reduce the prototype of Tongguan elevation and model test, and achieved certain results, which make the elevation of Tongguan elevation to a certain degree of control. In this paper, several measures that may reduce the elevation of Tongguan, such as changing the operation mode of Sanmenxia Reservoir, dredging dredging, river regulation and so on, are discussed for discussion.