思林水电站工程思林水电站位于乌江中游,坝址位于贵州省思南县城上游23km,距河口366km,距上游在建构皮滩电站89km, 距下游沙沱水电站115km,距贵阳市328km。思林水电站水库正常蓄水位440m,相应库容12.05 亿m~3,调节库容3.17亿m~3,防洪库容1.84亿m~3,电站装机1000MW。枢纽为一等工程,由大坝、泄洪建筑物、引水发电系统和通肮建筑物等组成。大坝为碾压混凝土重力坝,坝高117m;电站厂房布置在右岸,为地下式厂房, 安装4台单机容量为250MW 的混流式水轮发电机组;通航建筑物布置在左岸,采用全平衡卷扬提升式垂直升船机,按500t 级船舶过坝设计。
Silin Hydropower Project Silin Hydropower Station is located in the middle reaches of Wujiang River. The dam site is located at 23km upstream of Sinan County in Guizhou Province, 366km away from the estuary. It is 89km away from the upstream of Bitan Hydropower Station, 115km from the downstream Shatuo Hydropower Station and 328km away from Guiyang City. The normal water level of Silin Hydropower Station reservoir is 440m, with a corresponding storage capacity of 1.205 billion m 3, a regulation capacity of 317 million m 3, a flood control capacity of 184 million m 3 and a power plant of 1000MW. The hub is a first class project that consists of dams, flood discharge structures, diversion systems and Tong Nong buildings. The dam is a roller compacted concrete gravity dam with a dam height of 117m. The power plant is arranged on the right bank. It is an underground plant with 4 sets of Francis turbine units with a single unit capacity of 250MW. The navigable structures are arranged on the left bank with a fully balanced coil Yang hoisting vertical lift ship, according to 500t class ship dam design.