论文部分内容阅读
为贯彻落实国家防总全体会议精神,国家防总成员、国家能源局副局长王晓林于7月7日带队赴国家能源局大坝中心就水电站防汛抗洪工作进行再部署。王晓林副局长在大坝中心主持召开防汛抗洪专题会商会,听取大坝中心主任张春生关于当前全国水电站大坝防洪度汛工作情况的汇报,并对大坝中心如何继续抓好下一阶段水电站大坝安全度汛工作做出重要指示。会后,王晓林副局长在大坝中心负责同志的陪同下观看了大坝中心自行开发建设的全国水电站大坝安全远程管理系统,对大坝中心近年来取得的发展表示肯定和鼓励。王晓林一行还赴新安江水电站、富春江水电站进行防汛抗洪现场督查。
In order to implement the spirit of the national anti-general plenary meeting, Wang Xiaolin, member of the National Defense Agency and deputy director of the National Energy Administration, led a team to the National Energy Administration Dam Center on July 7 to redeploy the flood control and flood fighting work for the hydropower station. Wang Xiaolin, deputy director of the center of the dam chaired flood control and flood fighting conference, heard the director of the dam center Zhang Chunsheng on the current national flood control flood dam work report, and the dam center how to continue the next phase of hydropower dam Flood security work to make an important directive. After the meeting, Wang Xiaolin, accompanied by responsible comrades at the dam center, watched the Dam Safety Remote Management System of the National Hydropower Station developed and built by the Dam Center and expressed his recognition and encouragement for the progress made by the dam center in recent years. Wang Xiaolin and his entourage also went to Xin’anjiang Hydropower Station and Fuchunjiang Hydropower Station to conduct on-site inspections of flood control and flood fighting.