亭子口水利枢纽位于四川省广元市苍溪县境内嘉陵江干流中游河段上段,具有防洪、发电、灌溉及城乡供水、航运及其它综合利用效益。亭子口水利枢纽电站总装机规模为1100 MW,安装有4台单机额定功率为275 MW的混流式水轮发电机组。水轮机调速器是水电站机组的重要附属设备,它与电站计算机监控系统相配合,完成水轮发电机组的开机、停机、增减负荷、紧急停机、自动发电控制等任务,调速器系统的
Tingzikou Water Control Project is located in the upper reaches of the middle reaches of the Jialing River in Cangxi County, Guangyuan City, Sichuan Province. It has flood control, power generation, irrigation, urban and rural water supply, shipping and other comprehensive utilization benefits. The total installed capacity of the Tingzikou Hydropower Station is 1,100 MW, with four single-flow Francis turbine units of 275 MW rated capacity installed. Turbine governor is an important auxiliary unit of hydropower station. It cooperates with power station computer monitoring system to complete the tasks of starting, stopping, increasing and decreasing loads, emergency stop and automatic power generation control of hydroelectric generator. The governor system