高炉冷却壁经使用一段时间后,在水管内会结很厚的垢,影响冷却效率,严重时,可发生炉缸烧穿事故.为了清除水管内的积垢,国内常用的方法为酸洗.我厂每座高炉每年要进行1-2次酸洗.每次酸洗要花4140元,同时酸洗劳动强度大、时间长了还会引起职业病.我厂于1981年到鞍钢炼铁厂学习砂洗高炉冷却壁的新方法,结合我厂具体情况进行了用压力为4-6公斤/厘米~2的压缩空气输送粒度为3-4毫米的烧结矿粒吹洗高炉冷却壁的试验,收到可喜的效果.设备如下图:操作方法
Blast furnace cooling stave has been used for a period of time, will end in the water pipe thick dirt, affecting the cooling efficiency, serious, may occur burned cylinder accident. In order to clear the pipe scale, the domestic commonly used method is pickling. Each blast furnace in our factory should carry out pickling 1-2 times a year, each pickling cost 4140 yuan, at the same time pickling labor intensity, a long time will cause occupational disease .I plant in 1981 to the Ansteel Ironworks learning Sand blast furnace cooling wall of the new method, combined with the specific circumstances of our factory with a pressure of 4-6 kg / cm ~ 2 compressed air delivery particle size of 3-4 mm sintered ore blast furnace cooling stave test, received To the gratifying effect.The equipment is as follows: How to operate