论文部分内容阅读
1 基本情况河南省地跨黄、淮、海、长江四大流域,除黄委直接管理的黄河、沁河干流之外,流域面积在100km~2以上的干、支流河道共491条,总长2.54万 km,堤防总长1.53万km。按照1964年原水电部颁发的《堤防工程管理通则〈试行〉》规定:“为巩固堤防,提供防汛料物,增加收入,减少国家财政支出,管理机构应利用堤防两旁的土地资源,因地制宜地开展绿化工作”和“临河防浪,背河取材”、“为了避免堤身发生水沟、浪窝,堤坡上应种
1 Basic Conditions Henan Province covers a total of 491 dry and tributary rivers with a catchment area of 100 km ~ 2 and a total length of 2.54 over the Yellow River, Huaihe River and Yangtze River drainage areas except the Yellow River and Qinhe River directly under the management of the Yellow River Management Commission. Wan km, embankment total length of 15,300 km. In accordance with the ”General Rules for Dike Engineering Management“ issued by the former Ministry of Water and Electricity in 1964: ”In order to consolidate embankments, provide flood control materials, increase revenue and reduce state financial expenditures, the regulatory agencies should make use of the land resources on both sides of the embankments and adjust measures to local conditions To carry out green work “and ” Linhe anti-wave, backwater draw “, ” In order to avoid the dikes occurred ditch,