论文部分内容阅读
实地取样千余组,数据测定200余次,通过在长平矿瓦斯实验室和河南理工大学实验室科学分析,得出长平矿特殊地质条件下瓦斯含量与压力关系、瓦斯抽放半径、应力三带范围,再运用所得数据为长平矿瓦斯治理提供技术支撑,使长平矿瓦斯抽放量从每月20万每立方米提升至70万立方米,瓦斯抽放率达到42%。这是晋煤集团长平公司依托技术创新促进企业转型跨越发展的一个缩影。技术创新作为企业应对危机挑战、转型跨越发展的关键环节,晋煤集团长平公司通过引发职工“头脑风暴”驱动技术革新,通过强化和辽宁工程技术大学、河南理工大学等高等院校合作,设立实操培训基地和专项实验室,引进先进生产设施和工艺,
More than one thousand samples were taken from the field and the data was measured more than 200 times. Based on the scientific analysis of Changping Mine Gas Laboratory and Henan Polytechnic University, the relation between gas content and pressure under the special geological conditions of Changping Mine was obtained. The gas drainage radius, Three bands, and then use the data obtained for the Changping mine gas control to provide technical support, Changping mine gas drainage from 200,000 cubic meters per month to 700,000 cubic meters, gas drainage rate of 42%. This is Jincheng Group Changping relying on technological innovation to promote enterprise transformation across the development of a microcosm. Technology Innovation As a key step in the enterprise’s response to crisis and transformation and leapfrog development, Jinping Changping Co., Ltd. initiated cooperation with colleges and universities such as Liaoning Technical University and Henan Polytechnic University by initiating staff “brainstorming ” driving technological innovation. , Set up a practical training base and special laboratory, the introduction of advanced production facilities and technology,