论文部分内容阅读
随着鞍钢新区烧结、高炉、炼钢、连铸、2150热连轧以及9号3.5万立制氧机等配套设施相继竣工投产,令国内外同行瞩目的鞍钢500万吨现代化新区已基本建成。目前,新区从炼铁到热轧的生产主线实现全线贯通。鞍钢新区500万吨精品板材基地建设项目是鞍钢建设最具国际竞争力的大型钢铁
As Anshan Iron and Steel New Area sintering, blast furnace, steelmaking, continuous casting, 2150 hot rolling and No. 9 35,000 oxygen plant and other ancillary facilities have been completed and put into production, so that domestic and foreign counterparts attention Anshan Iron and Steel 5 million tons modern district has been basically completed. At present, the main production line of the New District from iron-making to hot-rolling reaches a full line. Anshan Iron and Steel New Area 5000000 tons of quality sheet base construction project is Anshan Iron and Steel Construction building the most international competitiveness of large steel