以张家口市某高层住宅小区1,2号楼为试点工程,采用夯扩挤密干硬性混凝土桩对其地基进行加固处理。详细介绍了夯扩挤密干硬性混凝土桩施工工艺参数和流程。干硬性混凝土试块抗压强度试验和单桩静载试验证明,该桩可穿透厚度为2.0m左右的复杂地层、可极大提高地基土承载力、有效消除地基土的湿陷性并可有效调节地基土的不均匀性;与CFG桩比较,夯扩挤密干硬性混凝土桩可降低造价20%左右,工期可缩短1/4以上。
Take Zhangjiakou City, a high-rise residential complex building 1, 2 as a pilot project, using rammed compacted dry hard concrete piles to reinforce the foundation. The technical parameters and process of compaction and expansion of dry-hard concrete pile are introduced in detail. The compressive strength test of dry rigid concrete block and the static load test of single pile prove that the pile can penetrate complicated formations with a thickness of about 2.0m and can greatly improve the bearing capacity of foundation soil and effectively eliminate the collapsibility of foundation soil Compared with CFG pile, compaction and expansion of compacted dry rigid concrete piles can reduce the cost by about 20% and the construction period can be shortened by more than 1/4.