邢钢烧结厂 4台处于末期特护阶段 1 2 0m2 烧结机 2 0 0 2年不但实现产量 2 2 4万t,而且挖潜增效降本效果显著 ,综合产品可比成本降低 2 993万元。2 0 0 2年以来 ,邢钢烧结厂面临 1 80m2 烧结机开工建设、4台烧结机处于末期维护和高炉扩容带来的生产压力。为此 ,该厂认真落?
Xingtai Sintering Plant 4 units in the final stage of special protection 120m2 sintering machine in 2002 not only to achieve output of 2240000 t, and the potential of tapping the potential of efficiency is significant, the cost of integrated products reduced by 29.93 million yuan. Since 2002, Xingang Sintering Plant is facing the construction of 1 80m2 sintering machine and 4 sintering machines in the final stage of maintenance and production pressure brought by blast furnace expansion. To this end, the plant seriously down?