随着BIM在工程建设方面的应用实践深入,BIM所带来的优势也逐渐显现,尤其是在设计阶段的三维模拟和设备管线碰撞优化、施工过程的空间和进度可视化展示、竣工阶段的设备管线模型信息移交等方面的价值。为更好地开展项目管理工作,达到项目设定的安全、质量、进度、投资等各项管理最终最佳目标,通过建立工程3D模型、结合4D/5D动态工程筹划及造价辅助等BIM先进管理手段,以数字化、信息化和可视化的方式实现基于BIM的建设项目管理,提升前期策划深度、设计深度、建设精细化管理深度。
As BIM’s practical application in engineering construction progresses, the advantages brought by BIM are gradually emerging, especially in the design phase of 3D simulation and equipment pipeline collision optimization, space and schedule visualization of the construction process, equipment pipeline of the completion phase Model information transfer and other aspects of the value. In order to better carry out the project management and reach the ultimate goal of safety, quality, progress, investment and other management of the project, through the establishment of the project 3D model, combined with 4D / 5D dynamic project planning and cost-aided BIM advanced management Means to digitize, information and visualization of BIM-based construction projects to achieve management, enhance the depth of pre-planning, design depth, the depth of building sophisticated management.