我矿目前是待开采的大型深凹露天铁矿。矿体规模大、开采条件尚好,曾几次经国内设计与近期的国外设计。在国外的设计中,应用了组合台阶(或陡帮)采剥法。它与国内设计采用的单个台阶(或缓帮)采剥法相比,已显示出具有能均衡生产剥采比,降低前期剥离高峰,减少基建剥岩量,提高矿山生产能力,有利边坡稳定以及排水等优点。本文就我矿的具体设计情况,对组合台阶法的优点与有关参数的确定加以探讨。
My mine is currently a large open pit open pit to be mined. Large-scale ore body, mining conditions are still good, several times by the domestic design and recent foreign design. In foreign design, the combination of steps (or steep help) stripping method. Compared with the single step (or slow) stripping method used in domestic design, it has been shown to be able to balance the stripping ratio, reduce the peak of pre-stripping, reduce the amount of stripping rock, increase the production capacity of the mine, facilitate the slope stability and Drainage and other advantages. In this paper, the specific design of mine mine, the advantages of the combined step method and to determine the parameters to be discussed.