鲁布革水电站已于1992年12月11日在驻地正式通过国家竣工验收。鲁布革水电站装机容量60万kW,年发电量28.49亿kWh,它是我国“六五”至“七五”期间建设的重点工程。从1982年11月主体工程导流洞开工起算至1988年底第一台机组发电,共历时6年,最后一台机组也在1991年6月投产,至1992年底止累计发电量已达81.9亿
Lubuge hydropower station on December 11, 1992 at the station officially passed the national completion of acceptance. With an installed capacity of 600,000 kW and an annual generating capacity of 2,849 million kWh, the Lubuge Hydropower Station is a key project under construction in China during the “65th Five-Year Plan” to the “Seventh Five-Year Plan”. Starting from the construction of the diversion tunnel of the main project in November 1982 to the first generation of power generation by the end of 1988, the last generation took a total of 6 years and the last one was put into operation in June 1991. By the end of 1992, the accumulated power generation had reached 8.19 billion