我国第一座充气橡胶坝的运用经验

来源 :广东水电科技 | 被引量 : 0次 | 上传用户:rain918
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
我国第一座充气橡胶坝于1969年7月在广东省流溪河水电站建成,至今正常运用了15年.一、概况流溪河水电站于1958年建成,是一个以发电为主,兼顾防洪与灌溉的综合性开发工程.水库总库容为3.78亿立方米.大坝为78米高的混凝土拱坝,坝上溢流段设七孔开敞式溢洪道(其中三孔高槛、四孔低槛,溢流时空中对冲消能).由于水库调节性能不高,遇到来水较丰的年份常有不同程度的弃水(水电站建成的头十年就 The first inflatable rubber dam in China was built in Liuxihe Hydropower Station in Guangdong Province in July 1969 and has been in normal use for 15 years I. Overview The Liuxihe Hydropower Station was completed in 1958 and is a power generation- Irrigation integrated development project. The total reservoir capacity of 378 million cubic meters. Dam is a 78-meter-high concrete arch dam, overflow overflow dam has seven open-ended spillway (including three high threshold, four low threshold , Overflow space-time hedge energy dissipation.) Due to the reservoir performance is not high regulation, encountered more abundant water years often have different levels of waste water (hydropower station built in the first ten years
其他文献
第1期序············································································
本文详细地阐述了我国脉钨矿床的岩体移动特征,这些特征主要表现为岩移机制受结构弱面制约,移动形式与岩体结构密切相关。对于呈碎裂结构的岩体,移动形式表现为“碎块联动”,
绪言塞沃内托型浮选机是由北大名誉教授高桑设计的。1979年在三池选煤厂采用了一台单侧刮泡式容积为7米~3的浮选槽,进行工业性试验。1981年煤炭技术研究所又增加了二台浮选
淮河流域经过建国40年来的治理,已形成一个比较完整的低标准的防洪、除涝、灌溉、航运体系,初步改变了黄河夺淮所造成的水系紊乱、水流不畅的局面,昔日“小雨小灾,无雨旱灾
所有的摩擦提升机均会经受钢绳滑动,钢绳滑动的大小取决于罐笼装载情况、气候条件、提升机绳轮的状况和其它因素。钢绳滑动通常是小的和不重要的,而且在罐笼的每一站 All f
出现在动词后的“在+LP”结构,功能已经发生了嬗变。其中,“在”不再作为介词引介处所短语,对动作发生的处所进行说明,而是依附在动词上的附着词,帮助动词引介处所宾语。相应
本文从心理学关于记忆的理论出发分析如何能够有效地识记英语词汇及句型。文章试从记忆的结构这个角度深入论述英语学习过程中词汇及句型的记忆,以期改进学习者在英语学习上
韩庄闸管理所管理的胜利渠首闸位于枣庄市曹庄乡八里沟,距韩庄镇3.5公里,建于1976年11月,是以灌溉为主的七孔小型渠闸,设计流量80立方米每秒,有效灌溉面积32.6万亩。该闸建
塞佛尔压滤机是由美国犹他州艾姆柯公司研制的。它适用于化学、石油化工、食品加工、陶瓷工业、冶金等许多工业的废水过滤和净化。压滤机的结构示意图如图1所示。工作原理压
固始县在去冬今春的水利建设中,坚持“马不卸鞍,兵不卷刃,连续作战,治水兴县”的指导思想,开展了空前规模的农田水利基本建设,取得了显著成绩,为今后农业丰收奠定了坚实的基