论文部分内容阅读
一概述杭州会議后,我院为了貫彻对拱型屋架“暂停推广,等待考验一个时期再作結論”的指示,采取了三方面的措施: 1.对直接向我院索购拱型屋架标准图的设计、企业及施工单位发出通知,要求将未施工的工程改用其他型式屋架,已施工者应严格检查质量,以保证安全; 2.派遣检查組分赴各地,以拱型屋架为中心,对我院设计的工程項目及省市提出的項目进行质量检查; 3.在上海市建委领导下,对屋架进行系統試驗,和进行理论计算的复核研究等工作。据不完全統計,至杭州会議为止,全国采用拱型屋架的工程項目有212项,建筑面积1508900平方米;已施工完畢者有96項,676000平方米,其中已經投入生产者为43项,314500平方米,按已施工项目分布的
After an overview of the Hangzhou conference, in order to carry out the instructions for the “suspending promotion of the arched roof truss and waiting for the test to reach a conclusion”, the Institute adopted three measures: 1. Acquiring arched roof truss standards directly to our hospital. The plans, companies and construction units of the plans issued notices requesting that the unconstructed projects be converted to other types of roof trusses. The construction workers should strictly inspect the quality in order to ensure safety; 2. Dispatch inspection teams to various places to focus on arched roof trusses. , To carry out quality inspections on the engineering projects designed by our institute and projects proposed by provinces and municipalities; 3. Under the leadership of the Shanghai Construction Commission, conducting systematic tests on roof trusses and performing review calculations for theoretical calculations. According to incomplete statistics, up to the Hangzhou conference, there were 212 projects using arched roof trusses throughout the country, with a building area of 1,508,900 square meters; and 96 projects had been completed, 676,000 square meters, 43 of which had been put into production, 314,500 Square meters, distributed according to the construction project