葛洲坝水力发电厂位于长江西陵峡口出口处约2.3公里的长江干流上,上距举世瞩目的三峡工程坝址38公里,是三峡工程的反调节电站。葛洲坝水力发电厂装机21台,总容量271.5万千瓦,年平均发电量157亿千瓦时。是我国已建成电厂中规模最大的发电厂,其中二江电厂装机7台,容量96.5万千瓦;大江电厂装机14台,容量175万千瓦。1981年12月27日,二江电厂第一台机组正式移交电厂生产;1988年12月全厂21台机组全部装完投入运行。现有固定资产原值
The Gezhouba Hydropower Plant is located on the main stream of the Yangtze River about 2.3 kilometers from the exit of the Ling Xiakou of Changjiang River. It is located 38 kilometers away from the dam site of the Three Gorges Project, which has attracted worldwide attention. It is the anti-regulation power station of the Three Gorges Project. The Gezhouba Hydropower Plant has 21 installed power stations with a total capacity of 2.715 million kilowatts and an average annual power generation capacity of 15.7 billion kwh. It is the largest power plant among the built power plants in China, of which 7 are installed at the Erjiang Power Plant with a capacity of 965,000 kilowatts, and 14 are installed at the Dajiang Power Plant with a capacity of 1.75 million kilowatts. On December 27, 1981, the first unit of Erjiang Power Plant was officially handed over to the power plant for production; in December 1988, all 21 units of the plant were fully put into operation. Existing fixed assets