1996年7月4日,西北电管局浦城发电厂40万元水土流失补偿费如数转到渭南市水保监督管理总站的账户上,至此,一起历时两年之久的人为水土流失大案终于圆满结案.蒲城电厂位于蒲城县东部洛河西岸,占地达260多hm~2,属大型火力发电厂,1983年正式筹建,为陕西省重点建设项目,它的建成对加快陕西省基础设施建设,促进陕西乃至西北地区经济发展具有举足轻重的作用.蒲城县水保监督站1994年5月在依法进行水保监督检查时发现蒲城电厂在建设施工中,既未申报水保方案,也未采取任何水保防治措施,破坏了大量地貌植被,并将弃土随意排入沟道、河床,一遇暴雨全部流入洛河,造成严重水土流失.县水保监督站多次与厂方接触交涉,督促其按水保法律规定补报水保方案,对造成的水土流失进行治理,交纳补偿费,提供占地面积、弃土量等文件资料.但蒲城电厂以建厂在先、水保法颁布在后、水保方案编报责任不明、全国电力建设还没有就水保方案进行专门设计的、概算中无补偿费款项等为由,称厂方无权
On July 4, 1996, the amount of compensation for water and soil loss of 400,000 yuan in Pucheng Power Plant of Northwest Electricity Administration was transferred to the account of Weinan Water and Soil Conservation Administration Station. At this point, a major case of soil and water loss with a duration of two years Finally completed successfully.Pucheng Power Plant is located in the west of Luohe in eastern Pucheng County, covering an area of more than 260 hm ~ 2, is a large-scale thermal power plant, formally established in 1983 for the key construction projects in Shaanxi Province, and its completion of accelerating Shaanxi Province Infrastructure construction and promote the economic development of Shaanxi and even the northwest region plays an decisive role.Pucheng County Soil and Water Conservation Supervision Station in May 1994 in accordance with the law on soil and water conservation supervision and inspection found Pucheng power plant construction and construction, , Nor did they take any measures to prevent and control soil and water conservation, destroyed a large number of landform vegetation and spoil the spoils into the channels and river beds, and all rainfall flows into Luohe caused serious water and soil erosion. Party contact negotiations, urging them to make up the program of water and soil conservation according to the provisions of water and soil conservation laws, to control the resulting soil erosion, pay compensation and provide documents such as land area and spoil etc. Pucheng Power Plant, Soil and water conservation After the enactment of, Soil and Water Conservation preparation and reporting of responsibility is unknown, the country’s electric power construction has not been specifically designed to Soil and Water Conservation, the proposed budget no compensation payment and other grounds, saying that the factory has no right