空中华西村工程由一栋高328m的钢筋混凝土中央筒体与3栋高254.7m的外钢管柱框架-内筒体组合而成,外围筒体通过5道环向连廊及径向连廊连为一体,中央筒体顶部支撑4层高的大型球体。针对各筒体需统筹配合的特点,通过应用液压自爬模、内爬式塔式起重机、可移动式液压布料机、液压穿心式千斤顶等大型机械设备,将4个筒体的核心筒型钢柱安装、核心筒剪力墙施工、外围框架钢管柱、钢梁的安装以及钢管柱混凝土的施工有效组合起来,在保障安全、质量的前提下,大大缩短了工期、降低了工程成本,且形成一整套综合施工工艺。
The Huaxi Village project consists of a 328m high reinforced concrete central tube and three high 254.7m outer steel tube frame-inner tubes combined together. The outer tube is connected by 5 rings to the corridor and the radial corridor As one, the top of the central cylinder supports a 4-storey large ball. In order to co-ordinate with each cylinder body features, through the application of hydraulic self-climbing model, the inner climbing tower crane, movable hydraulic distributor, hydraulic through-core jack and other large machinery and equipment, the four cylinder core barrel steel Column installation, construction of core tube shear wall, construction of steel frame columns and steel beams in outer frame and construction of concrete filled steel columns are effectively combined to greatly reduce the construction period, reduce the construction cost and form A complete set of construction technology.