论文部分内容阅读
本文对江西鄱余公路乔木湾乐安河特大桥主跨120m预应力混凝土连续T型刚构桥悬拼吊装施工进行总结,从施工的角度谈谈怎样做好悬拼吊装过程中的线形控制,对同类型的施工具有一定的参考价值。
This paper summarizes the construction of the 120m prestressed concrete continuous T-shaped rigid frame suspension bridge with spans and girders on the main span of Qiaomu Bay Le An River Bridge in Poku Highway in Jiangxi Province. From the point of view of construction, how to do the linear control in the process of hoisting and rebuilding, The same type of construction has a certain reference value.