摘要:随着高层建筑的不断建设,高层建筑的基坑支护施工技术就越加凸显出其重要性。基坑支护施工是为保证地下结构施工及基坑周边环境的安全,对基坑侧壁及周边环境采用的支挡、加固与保护措施的施工。在基坑开挖与支护期间,对支护结构进行现场观测,能随时掌握土层与支护结构的变化情况。 采取必要的措施, 保证安全确保工程顺利进行。
关键词:基坑工程工程施工边坡支护管理检测
Abstract: with the continuous development of high-rise buildings, high-rise building foundation pit support construction technology will increasingly highlight its importance. The construction of foundation pit support is to ensure that the underground structure construction of foundation pit and the surrounding environment safety, the construction side of foundation pit and the surrounding environment by retaining, reinforcement and protection measures. During the excavation and supporting in foundation pit, on-site observation of the supporting structure, can keep track of soil and supporting structure changes. To take the necessary measures to ensure safety, ensure the smooth implementation of the project.
Keywords: foundation pit engineering slope supporting management
中图分类号:TV551.4文献标识码: A 文章编号:
引言;深基坑工程的施工是一个循序渐进的过程,施工单位应按先设计、后施工的程序进行,并尽量做到边施工、边监测,还要遵循“分层开挖,先撑后挖,随挖随撑,对称均衡,限时限量”的原则, 加强对整个深基坑施工过程的控制 。
深基坑工程施工有着较高的技术要求,虽然通过大量的理论研究与工程实践,对于基坑边坡支护的研究有了一定突破性,但是基坑边坡支护的失稳问题仍亟需解决。失稳造成的坍塌、滑塌对周边设施以及人们的正常生活带来了极大的负面影响,因此要重点分析造成失稳的原因,进行防范和及时采取补救措施,保证工程顺利、安全地完成。
一、深基坑支护的施工
1. 深基坑支护的施工流程一般包括:施工前准备、支护桩的施工、连系梁的施工、锚杆的施工、土方开挖。支护桩一般采用人工挖孔桩,然后用钢筋混凝土做护壁。连系梁施工时,先开挖基槽,经验收合格后,进行抗渗墙混凝土的浇筑,最后再对连系梁施工。基坑挖至锚杆标准高度后,开始进行钻孔、制作锚头、穿锚索、注浆,安装连系梁,穿外锚具,然后锚固,最后进行锚杆试验。土方开挖要采用分层开挖,对挖出的土方要随时挖出随时运走,把土清理干净。在施工整个流程中,需要对工程进行实时监测,随时掌握工程情况,确保安全并对后来工作提供决策指导。
2. 基坑支护施工要综合考虑工程所在地的地理条件、工程类型、基坑开挖规模、周边环境、支护结构等因素。基坑支护施工要注重支护结构的稳定,坑体变形,并根据周边环境条件,控制变形在一定的范围内。控制的关键是基坑的稳定性、地面变形及地下水的控制,并要根据实际情况适时地调整方案。
3. 深基坑工程的事故处理:当深基坑工程监测项目的监测结果超过预警限制,要及时进行事故病害处理,查明导致监测结果偏大,产生病害事故的原因,判断发展的状况和动态,正确制定处理方案,迅速组织力量进行技术处理,避免失去时机,酿成更严重的后果。处理措施要概念清晰,方法正确、迅速有效,尽量减少事故损失。
二、對边坡支护失稳的原因分析
1.部分墙段发生滑坡,影响整体边坡的稳定性。基坑边坡设计的不合理会造成排水性差、易淤堵等问题。施工不当就容易导致坡体的暴露,受雨水侵蚀严重,导致边坡支护失稳。
2.边坡周边环境的影响。处于下水道口的基坑易受到下水道流动污水的影响。当下水道的某处接口发生破裂时,水流会渗入坑内,腐蚀止水桩,导致坑体的位移倾斜。下水道如年久失修,对基坑的影响就会非常大,边坡支护的稳定性也就无法得以保证。
3.自然因素的不可抗拒性。以某处的基坑为例,施工人员已经做好了维修工作,但是当地的降水量过大,土层经雨水冲刷而变松软,边坡支护的稳定性也难以得到保证,并且对于后续的维修以及施工造成了很大的困难。
三、如何减少支护失稳的发生
通过以上对边坡支护的失稳的原因分析,除自然因素无法解决外,还是可以通过对深基坑工程施工初期对边坡支护的细致设计,有效地减少支护失稳的发生。建筑工程在施工前必须进行实地考察,深基坑工程更应如此,要最大化的对施工方案进行仔细考究,设计出最佳的施工方案。
1.对施工现场周边的建筑进行考察,明确建筑物的建筑特点以及建筑位置。细致了解施工地下有无管道布设,对地下土层做地质分析,各基坑间要明确的分界标准。
2.分期施工,将整个施工过程分为两个阶段。第一阶段主要对基坑边坡的骨架进行设计,一般采用钢管桩作为边坡支护的主体;第二阶段为土方的挖掘以及边坡的混凝土保护层的施工,边坡支护的距离可以通过对施工现场的土质进行灵活安排。土层较坚硬处可以加大支护距离,如果土层松软,不仅要对土层进行加固处理,还需要调节支护间距,让支护距离尽量小些,保证边坡支护的稳定性。
3.工作面开挖出后要马上进行喷锚施工,避免坑体遭遇雨水冲击以及阳光暴晒等不利因素。支护要与开挖同时进行。
4.在进行分层施工时,要考虑不同材质的特性,锚杆按照工程要求的不同进行分类处理。每层普通锚杆的施工一般需要5天,而起支撑作用的预应力锚杆则需要9天左右。分层施工中,要等待水泥硬度达到一定标准时才可以进一步开挖,通常标准设定为70%。
5.采用专门的技术人员对施工进行监控,定期对施工质量进行检查。在施工中查找疏漏,并进行反馈解决。
四、科学的深基坑边坡支护施工法
1.开挖土方
机械化挖掘,并由主管锚喷的技术施工人员进行清土处理。根据施工的要求开挖出操作面,并采用分层分段挖掘,挖掘工作与边坡工作相互配合。土方开挖出的土需要用车转运,装运地点在基坑内。
2.安放加固器件
边坡支护的加固器件一般采用钢管桩,对钢管的要求为底部为“V”形缺口,每隔一段距离设置出浆口,口径大小有其严格的技术规定。钢管内部用压浆灌注,压浆原料主要为水泥浆,浆压不能超过 0.7Mpa。钢管内部注满后,要等压浆收凝后进行补浆处理。
3.锚杆的施工方法
锚杆按其类别可分为普通锚杆和预应力锚杆。普通锚杆的施工首先要求确定位锚孔的位置,然后用钻机进行迁移定位,等到调整好锚孔角度进行钻孔处理,最后灌注压浆以及对管口进行补浆处理;预应力锚杆应先搭建施工平台,再确定孔位,利用钻机进行角度,定位,钻孔并清理孔径,灌浆并进行张力与拉力的锁定处理。
五、基坑的管理与检测
为保证深基坑工程的安全施工,施工单位应委派专门的技术人员进行全天实时监控。及时发现开挖中出现的问题,基坑边坡的受力情况以及周边环境的影响。道路的影响应放在首位,要随时掌握坑体的相关数据、受力大小、位移移动以及支护的沉降,以此为监控依据做到实时维护管理。
对基坑的检测主要包括沉降、位移、深层以及在周边受力与是否变形,具体检测方法如下:
检测沉降:采用先进的测量技术,观测点要设置在基坑的边坡上体面上,基准点定位在距离测试点较远的位置。
检测位移:采用先进的测量仪器,对于深层土层的测量可以由测斜仪来实现。
人员巡查:为保证施工工程的安全顺利进行,施工单位应委派专业的技术人员进行24小时全天监控,并做好记录。
观测结果分析:将以上的观测结果制作成表格,绘制曲线图形根据图形数据分析是否有稳定性问题并及时向上级管理人员汇报,决定是否进行补救加固等措施。
施工安全检查:在施工前对施工现场进行检查,重点检查地下设施以及是否存在障碍物等,如果有暂不能处理的区域应作出标记。建立完善的安全机制,提高施工人员的安全意识,针对不同工种制定综合安全措施方案。基坑要架设防护栏以及台阶等,便于施工人员出入行走。如果发现土体隆起现象,则说明坡体内部有滑坡出现,解决办法是用重物来压制隆起的土体,并在压制一段时间后进行必要的加固处理。排水沟要尽早完成,防止因排水不畅而对边坡支护造成的损害。
六、如何对支护失稳进行补救
施工前的细致设计以及施工过程中的检测机制都可以有效地减少基坑出现边坡支护失稳,但是边坡支护的失稳现象仍会因为自然因素以及周边环境的因素而发生。所以,施工单位还需做好施工后的维护工作,制定相应的补救措施,把因支护失稳而造成的损失降到最低。
基坑的边坡支护出现位移下滑现象,补救方案如下:
1.由于边坡出现滑移后,土层内的锚钉的抗拉能力部分或者是全部失效,因此在这种情况下,施工人员应在边坡支护出安置管钉进行加固处理,以此增强锚钉的抗拉力。管钉的长度与安插位置应以实际情况而定。
2.灌浆处理,灌浆分为坡顶灌浆和裂缝灌浆。坡顶灌浆是因为边坡的滑移会使止水桩破裂,对其进行坡顶灌浆可以防止渗漏;裂缝灌浆是为了避免天然降水以及径流的渗入对土层进行破坏。
3.稳定坡脚,对坡脚进行加固处理,可以用涂漆的木桩进行固定,阻止边坡继续滑移。
4.施工现场应安设降水井,对积水进行及时地抽降处理,工作人员应24小时监控,观测边坡是否有继续滑移的趋势。位移观测点的位置要安设准确,并对井水进行观测,并按时记录。
结束语;
工程施工人员应把握好施工前后的每一个步骤,包括施工前的实地考察,施工内容的确定,同时要做好相应的应急补救措施,最大限度的減小因失稳而带来的损失。理论研究要依托于大量的实践经验,总之要切合实际施工,才能保证工程质量,减少损失。
关键词:基坑工程工程施工边坡支护管理检测
Abstract: with the continuous development of high-rise buildings, high-rise building foundation pit support construction technology will increasingly highlight its importance. The construction of foundation pit support is to ensure that the underground structure construction of foundation pit and the surrounding environment safety, the construction side of foundation pit and the surrounding environment by retaining, reinforcement and protection measures. During the excavation and supporting in foundation pit, on-site observation of the supporting structure, can keep track of soil and supporting structure changes. To take the necessary measures to ensure safety, ensure the smooth implementation of the project.
Keywords: foundation pit engineering slope supporting management
中图分类号:TV551.4文献标识码: A 文章编号:
引言;深基坑工程的施工是一个循序渐进的过程,施工单位应按先设计、后施工的程序进行,并尽量做到边施工、边监测,还要遵循“分层开挖,先撑后挖,随挖随撑,对称均衡,限时限量”的原则, 加强对整个深基坑施工过程的控制 。
深基坑工程施工有着较高的技术要求,虽然通过大量的理论研究与工程实践,对于基坑边坡支护的研究有了一定突破性,但是基坑边坡支护的失稳问题仍亟需解决。失稳造成的坍塌、滑塌对周边设施以及人们的正常生活带来了极大的负面影响,因此要重点分析造成失稳的原因,进行防范和及时采取补救措施,保证工程顺利、安全地完成。
一、深基坑支护的施工
1. 深基坑支护的施工流程一般包括:施工前准备、支护桩的施工、连系梁的施工、锚杆的施工、土方开挖。支护桩一般采用人工挖孔桩,然后用钢筋混凝土做护壁。连系梁施工时,先开挖基槽,经验收合格后,进行抗渗墙混凝土的浇筑,最后再对连系梁施工。基坑挖至锚杆标准高度后,开始进行钻孔、制作锚头、穿锚索、注浆,安装连系梁,穿外锚具,然后锚固,最后进行锚杆试验。土方开挖要采用分层开挖,对挖出的土方要随时挖出随时运走,把土清理干净。在施工整个流程中,需要对工程进行实时监测,随时掌握工程情况,确保安全并对后来工作提供决策指导。
2. 基坑支护施工要综合考虑工程所在地的地理条件、工程类型、基坑开挖规模、周边环境、支护结构等因素。基坑支护施工要注重支护结构的稳定,坑体变形,并根据周边环境条件,控制变形在一定的范围内。控制的关键是基坑的稳定性、地面变形及地下水的控制,并要根据实际情况适时地调整方案。
3. 深基坑工程的事故处理:当深基坑工程监测项目的监测结果超过预警限制,要及时进行事故病害处理,查明导致监测结果偏大,产生病害事故的原因,判断发展的状况和动态,正确制定处理方案,迅速组织力量进行技术处理,避免失去时机,酿成更严重的后果。处理措施要概念清晰,方法正确、迅速有效,尽量减少事故损失。
二、對边坡支护失稳的原因分析
1.部分墙段发生滑坡,影响整体边坡的稳定性。基坑边坡设计的不合理会造成排水性差、易淤堵等问题。施工不当就容易导致坡体的暴露,受雨水侵蚀严重,导致边坡支护失稳。
2.边坡周边环境的影响。处于下水道口的基坑易受到下水道流动污水的影响。当下水道的某处接口发生破裂时,水流会渗入坑内,腐蚀止水桩,导致坑体的位移倾斜。下水道如年久失修,对基坑的影响就会非常大,边坡支护的稳定性也就无法得以保证。
3.自然因素的不可抗拒性。以某处的基坑为例,施工人员已经做好了维修工作,但是当地的降水量过大,土层经雨水冲刷而变松软,边坡支护的稳定性也难以得到保证,并且对于后续的维修以及施工造成了很大的困难。
三、如何减少支护失稳的发生
通过以上对边坡支护的失稳的原因分析,除自然因素无法解决外,还是可以通过对深基坑工程施工初期对边坡支护的细致设计,有效地减少支护失稳的发生。建筑工程在施工前必须进行实地考察,深基坑工程更应如此,要最大化的对施工方案进行仔细考究,设计出最佳的施工方案。
1.对施工现场周边的建筑进行考察,明确建筑物的建筑特点以及建筑位置。细致了解施工地下有无管道布设,对地下土层做地质分析,各基坑间要明确的分界标准。
2.分期施工,将整个施工过程分为两个阶段。第一阶段主要对基坑边坡的骨架进行设计,一般采用钢管桩作为边坡支护的主体;第二阶段为土方的挖掘以及边坡的混凝土保护层的施工,边坡支护的距离可以通过对施工现场的土质进行灵活安排。土层较坚硬处可以加大支护距离,如果土层松软,不仅要对土层进行加固处理,还需要调节支护间距,让支护距离尽量小些,保证边坡支护的稳定性。
3.工作面开挖出后要马上进行喷锚施工,避免坑体遭遇雨水冲击以及阳光暴晒等不利因素。支护要与开挖同时进行。
4.在进行分层施工时,要考虑不同材质的特性,锚杆按照工程要求的不同进行分类处理。每层普通锚杆的施工一般需要5天,而起支撑作用的预应力锚杆则需要9天左右。分层施工中,要等待水泥硬度达到一定标准时才可以进一步开挖,通常标准设定为70%。
5.采用专门的技术人员对施工进行监控,定期对施工质量进行检查。在施工中查找疏漏,并进行反馈解决。
四、科学的深基坑边坡支护施工法
1.开挖土方
机械化挖掘,并由主管锚喷的技术施工人员进行清土处理。根据施工的要求开挖出操作面,并采用分层分段挖掘,挖掘工作与边坡工作相互配合。土方开挖出的土需要用车转运,装运地点在基坑内。
2.安放加固器件
边坡支护的加固器件一般采用钢管桩,对钢管的要求为底部为“V”形缺口,每隔一段距离设置出浆口,口径大小有其严格的技术规定。钢管内部用压浆灌注,压浆原料主要为水泥浆,浆压不能超过 0.7Mpa。钢管内部注满后,要等压浆收凝后进行补浆处理。
3.锚杆的施工方法
锚杆按其类别可分为普通锚杆和预应力锚杆。普通锚杆的施工首先要求确定位锚孔的位置,然后用钻机进行迁移定位,等到调整好锚孔角度进行钻孔处理,最后灌注压浆以及对管口进行补浆处理;预应力锚杆应先搭建施工平台,再确定孔位,利用钻机进行角度,定位,钻孔并清理孔径,灌浆并进行张力与拉力的锁定处理。
五、基坑的管理与检测
为保证深基坑工程的安全施工,施工单位应委派专门的技术人员进行全天实时监控。及时发现开挖中出现的问题,基坑边坡的受力情况以及周边环境的影响。道路的影响应放在首位,要随时掌握坑体的相关数据、受力大小、位移移动以及支护的沉降,以此为监控依据做到实时维护管理。
对基坑的检测主要包括沉降、位移、深层以及在周边受力与是否变形,具体检测方法如下:
检测沉降:采用先进的测量技术,观测点要设置在基坑的边坡上体面上,基准点定位在距离测试点较远的位置。
检测位移:采用先进的测量仪器,对于深层土层的测量可以由测斜仪来实现。
人员巡查:为保证施工工程的安全顺利进行,施工单位应委派专业的技术人员进行24小时全天监控,并做好记录。
观测结果分析:将以上的观测结果制作成表格,绘制曲线图形根据图形数据分析是否有稳定性问题并及时向上级管理人员汇报,决定是否进行补救加固等措施。
施工安全检查:在施工前对施工现场进行检查,重点检查地下设施以及是否存在障碍物等,如果有暂不能处理的区域应作出标记。建立完善的安全机制,提高施工人员的安全意识,针对不同工种制定综合安全措施方案。基坑要架设防护栏以及台阶等,便于施工人员出入行走。如果发现土体隆起现象,则说明坡体内部有滑坡出现,解决办法是用重物来压制隆起的土体,并在压制一段时间后进行必要的加固处理。排水沟要尽早完成,防止因排水不畅而对边坡支护造成的损害。
六、如何对支护失稳进行补救
施工前的细致设计以及施工过程中的检测机制都可以有效地减少基坑出现边坡支护失稳,但是边坡支护的失稳现象仍会因为自然因素以及周边环境的因素而发生。所以,施工单位还需做好施工后的维护工作,制定相应的补救措施,把因支护失稳而造成的损失降到最低。
基坑的边坡支护出现位移下滑现象,补救方案如下:
1.由于边坡出现滑移后,土层内的锚钉的抗拉能力部分或者是全部失效,因此在这种情况下,施工人员应在边坡支护出安置管钉进行加固处理,以此增强锚钉的抗拉力。管钉的长度与安插位置应以实际情况而定。
2.灌浆处理,灌浆分为坡顶灌浆和裂缝灌浆。坡顶灌浆是因为边坡的滑移会使止水桩破裂,对其进行坡顶灌浆可以防止渗漏;裂缝灌浆是为了避免天然降水以及径流的渗入对土层进行破坏。
3.稳定坡脚,对坡脚进行加固处理,可以用涂漆的木桩进行固定,阻止边坡继续滑移。
4.施工现场应安设降水井,对积水进行及时地抽降处理,工作人员应24小时监控,观测边坡是否有继续滑移的趋势。位移观测点的位置要安设准确,并对井水进行观测,并按时记录。
结束语;
工程施工人员应把握好施工前后的每一个步骤,包括施工前的实地考察,施工内容的确定,同时要做好相应的应急补救措施,最大限度的減小因失稳而带来的损失。理论研究要依托于大量的实践经验,总之要切合实际施工,才能保证工程质量,减少损失。