论文部分内容阅读
本文介绍了柳钢线材厂“一火成材”改造的施工组织与管理,及通过优化设计、优化施工技术方案和施工组织来缩短施工工期,降低工程造价所采用的具体施工技术和方法。
This paper introduces the construction organization and management of Liuzhou Iron and Steel Wire Mill Co., Ltd. and the specific construction techniques and methods adopted to shorten the construction period and reduce the construction cost by optimizing the design and optimization of construction technology and construction organization.