【摘 要】
:
一、概述:世界上第一座地下式水电站自1904~1907年建成以来,地下式水电站的采用越来越广泛,我国在1956年建成第一座地下式水电站,五十年代相继建成三座,六十年代有六座投产,
论文部分内容阅读
一、概述:世界上第一座地下式水电站自1904~1907年建成以来,地下式水电站的采用越来越广泛,我国在1956年建成第一座地下式水电站,五十年代相继建成三座,六十年代有六座投产,到七十年代就有19座地下式水电站建成,到八十年代,大型地下式白山水电站并网发电。目前,我国已建成的地下式水
I. Overview: Since the first underground hydropower station in the world was built from 1904 to 1907, the underground hydropower stations have been used more and more widely. China built the first underground hydropower station in 1956 and completed three in the 1950s. Six were put into operation in the 1960s and 19 underground hydropower stations were built in the 1970s. By the 1980s, large underground Baishan Hydropower Station was connected to the grid. At present, our country has built underground water
其他文献
本文从长江历年治水情况和中下游堤防现状分析了长江防洪问题,提出了综合治理长江洪水的看法,即搞好水土保持,整治中下游河道,加高加固堤坊,利用现有支流水库和分蓄洪工程分
Objective: To investigate the antitumor activity and the mechanism of BRM-SJS on breast cancer cells. Methods: Flow cytometry, DNA agarose gel electrophoresis
关于留学生“的”字隐现的正确习得一直以来都是对外汉语教学中的难点和热点问题,深入探究“的”字隐现的本体研究对于留学生准确运用这一结构有着深刻的意义。本文针对留学
VSP(Vertical Seismic Profiling)——垂直地震剖面法勘探技术,是80年代发展起来的一种新的地球物理勘探方法。它是在地表设置震源激发地震波,在井中设置检波器接收,即在垂直
葛洲坝水利枢纽二江泄水闸(见图1)于1980年建成。1981年1月4日大江截流以后,即成为长江的主要泄水、排沙通道。5年来累
Gezhouba Dam two rivers sluice (see Figure 1) wa
在贵州岩溶山区,拱坝通常是优先考虑的一种坝型,因为拱坝在防渗、地基处理、施工渡汛以及节省工程量和劳力等方面,一般优于其他坝型。砌石拱坝能充分利用山区丰富的石料。在
江苏省工商局日前召开首批“广告审查员”颁证大会。从1996年四季度开始,江苏省工商局在全省各地积极组织广告经营单位报名,举办广告审查员培训班,安排培训、考试。截止1997
To investigate the therapeutic efficacy of compound immunotherapy of tumor deri ved heat shock protein 70 (HSP70) and interleukin 2 (IL 2) on tumor bearing
本文概述了内蒙古自治区三十多年来水利建设的主要成就及所获得的效益,指出了存在的主要问题和今后发展的方向。特别强调了必须继续大办水利;合理利用与保护水资源,以及通过