近年来,在华东电管局的主持下,我们于临近华东电网负荷中心的苏南、皖东南和浙北等地区开展了纯抽水蓄能电站站址选择工作,为深入进行规划选点收集了一些资料。现将站址选择工作中所研究的站址条件和工程实例作简要介绍如下。一、选择抽水蓄能电站站址条件抽水蓄能电站可供选择的站址较多,因为它所需的调蓄水量是在上下水库之间循环使用的,除少量蒸发和渗漏损失外,不需大量的径流供给。但是,抽水
In recent years, under the auspices of East China Electricity Board, we conducted site selection of pure pumped storage power stations in areas such as southern Jiangsu, southeastern Anhui and northern Zhejiang adjacent to the load center of East China Power Grid, and collected site selection for further planning some documents. Site selection now study site conditions and project examples are briefly described below. First, select the pumped storage station site conditions Pumped storage power station to choose from more sites, because it is required to adjust the storage of water is recycled between upper and lower reservoirs, with the exception of a small amount of evaporation and leakage losses, No large amount of runoff is needed. However, pumping water