论文部分内容阅读
◇设备运行:实现全自动化监控,自动开停机成功率达98%以上。◇安全生产记录:截止2005年底达772天。◇发电量:2003年86.2亿千瓦时,2004年391.6亿千瓦时,2005年490.9亿千瓦时。创建国际一流水电厂的总体思路和主要内容在筹建之初,三峡电厂按照三峡总公司赋予的“管好宏伟三峡电站
◇ equipment operation: to achieve fully automated monitoring, automatic shut down success rate of more than 98%. ◇ production safety records: as of the end of 2005 up to 772 days. Electricity generation: 8.62 billion kwh in 2003, 39.16 billion kwh in 2004 and 490.9 kwh in 2005. To create a world-class water plant general idea and main content At the beginning of preparation, the Three Gorges Power Plant in accordance with the Three Gorges Corporation given the "magnificent Three Gorges Power Station