论文部分内容阅读
介绍印尼西爪哇INDRAMAYU(3×330 MW)电厂项目防波堤平面布置和结构型式,阐述防波堤平面形态、口门位置的确定对掩护码头及取水口、减少泥沙淤积、降低温排水对取水口水温影响的重要作用,探讨淤泥质地质条件下斜坡式防波堤采用插塑料排水板和竹桩进行地基处理的方法,以及防波堤结构防止温排水渗透的措施。
Describes the plane layout and structure type of breakwater in INDRAMAYU (3 × 330 MW) power plant in West Java, Indonesia, and expounds the plane shape of breakwater and the location of the port door. It also reduces the sediment deposition and reduces the influence of warm drainage on the water temperature at the intake , The paper discusses the method of using plastic drainage board and bamboo piles to treat the foundation of sloping breakwater in silt geological conditions and the measures to prevent the infiltration of warm drainage by the breakwater structure.