论文部分内容阅读
“在汉江流域规划中,以大量的勘测资料和技术资料为基础,进行了相应的规划设计工作,研究比较了各种不同的开发方案,论证了各项技术措施的技术可能性和经济合理性(节引参考书刊②第8页)。”由于丹江口水利枢纽在防洪、灌溉、发电、航运等方面的优越性而被选作第一期工程。因此于1956年底,即开始了丹江口水利枢纽的初步设计工作。
“In the planning of the Hanjiang River Basin, based on a large amount of survey data and technical materials, the corresponding planning and design work was carried out, and various different development schemes were compared and the technical feasibility and economic rationality of various technical measures were demonstrated (References cited in Section 2, page 8). ”The first phase of the project was chosen for its superiority in flood control, irrigation, power generation and shipping. Therefore, at the end of 1956, the preliminary design of Danjiangkou hydro-junction was started.