天津新港进港主航道二期工程设计始于一九八一年,一九八二年三月开始施工,一九八四年十二月竣工。经天津市建委、交通部基建局等部门组织联合验收,鉴定为:“技术上合理,施工良好”。一九八五年天津港务监督制定通航规定,保证了天津港进出船舶的安全航行。该航道系为天津港四港池集装箱码头进出1800TEU第三代集装箱船配套项目,并为双向航行万吨级船舶提供条件。该航道全长23.154公里;设计水深-11.0米(天津新港理论深度基准面为准,下同);通航公告水深
The construction of the second phase of Tianjin New Port Main Channel entered the project started in 1981, started construction in March 1982 and completed in December 1984. The Tianjin Construction Committee, the Ministry of Infrastructure Construction Bureau and other departments jointly organized acceptance, identified as: “technically sound, good construction.” In 1985, Tianjin Port Authority formulated the navigation regulations to ensure the safe navigation of Tianjin Port in and out of the ship. The channel is Tianjin Port Sankangchi Container Terminal into and out of 1800TEU third-generation container ship matching projects, and two-way navigation of 10,000-ton vessels to provide the conditions. The channel length of 23.154 km; design depth of -11.0 m (Tianjin Newport theoretical depth datum, subject to the same below); navigational notice depth