论文部分内容阅读
针对原料厂公辅3台高压电动机控制线路远、干扰大的问题,对原控制系统进行了改造,从而缩短控制线路、降低线路干扰。
Aiming at the problems of far away from the high-voltage motor control lines in the raw material plant, three high-voltage motors, the original control system has been transformed to shorten the control lines and reduce the interference of the lines.