论文部分内容阅读
在党的社会主义建设总路线的光辉照耀下,我队的全体职工,通过轰轰烈烈的“十比”红旗竞赛运动,克服了前进中的重重困难,提前32天全面完成了1959年任务,高速度跨进了1960年。矿产储量都超额完成了年计划,铁矿超额9.8%,铜矿超额0.9%,矾矿超额53.6%,石棉增长69.8倍,此外,还完成了黄铁矿58.2万吨;完成的钻探工作量为年计划的100.62%,平巷工作量为年计划的129%,化验指数为年计划的173.1%;四项主要工程成本降低
With the glorious shining of the party’s general line of socialist construction, all the staff and workers of our team have overcome the difficulties in their progress through the spectacular “十 比” red flag race. They completed the task in 1959 32 days in advance and reached a high-speed cross Into 1960. Mineral reserves surpassed the annual plan by over 9.8% for iron ore, 0.9% for copper, 0.9% more for alum, 69.8 times asbestos, and 582,000 tons for pyrite. The drilling workload 100.62% of the annual plan, 129% of the work load of the roadway and 173.1% of the laboratory plan for the annual survey. The cost of the four major projects is reduced