论文部分内容阅读
根据作者完成的一项科研成果报告改写而成。文中系统介绍了应用系统工程排队论和计算机模拟技术编制地下矿山采掘进度计划的理论、方法和原理,主要包括以下内容:①排队论的应用和模拟模型的建立;②图形输入与输出;③数字模拟与交互式模拟;④动画式技术的应用。该成果经实际应用,收到了良好效果。
According to the author completed a report of scientific research adapted from. This paper systematically introduces the theory, method and principle of applying the system engineering queuing theory and computer simulation technology to the preparation of underground mine excavation schedule. The main contents include the following: ① the application of queuing theory and the establishment of simulation model; ② graphics input and output; ③ digital Simulation and interactive simulation; ④ animation technology. The results of the practical application, received good results.