摘要:公路工程造价管理在项目前期阶段到验收阶段发挥着重要的作用,科学合理的造价管理不仅能够为施工单位带来可观的经济利益,又能为社会创造价值。在公路工程造价管理时,要加强公路建设项目全过程和全动态的造价控制,改变旧式的观念和认识,加强高素质的造价管理人才的培养,健全工程造价管理法律法规,完善造价管理体系,促进我国公路交通施压的发展,实现经济利益与社会利益的双赢。
关键词:公路工程;造价;控制管理;策略
Abstract: Highway construction cost management in the early stages of the project to the acceptance stage plays an important role, not only reasonable scientific cost management can bring considerable economic benefits for the construction unit, and can create value for society. In the highway construction cost management, to strengthen the highway construction project entire process and dynamic cost control, change the old idea and understanding, strengthen the cultivation of high-quality talents and improve the cost management, project cost management laws and regulations, perfect cost management system, to promote the development of highway traffic pressure in China, to achieve a win-win economic and social the interests.
Key words: highway engineering; cost; control and management; strategy
中圖分类号:TU723.3
公路工程造价的控制和管理至关重要,由于公路工程施工工艺复杂、周期长、项目大,且存在许多不确定因素,公路建设项目的整个过程都需要资金的投入,所以在造价管理方面存在很大困难,它是我国目前面临的一个特殊性的难题。科学合理的控制和管理工程造价是公路工程项目的重点,下面针对我国公路工程造价的管理现状,提出相关建议和意见。
1公路工程造价的控制和管理现状
近年来,我国市场经济体制得到了不断的完善,工程造价管理也加快了发展的脚步,取得了一定的成绩。公共工程项目从开始到项目验收,都涉及到资金的投入,整个过程中用于公路建设的所有资金就是公路工程的造价。2007年,我国颁布了《公路基本建设项目概算预算编制办法》作为公路工程造价管理的主要依据,但是在工程实践过程中,仍然出现很多问题,许多项目的造价管理工作没有严格按照相关法律规定,导致工程造价管理不规范。
2公路工程造价管理存在的问题
公路工程从项目决策到项目完成整个阶段的资金投入都应该控制在批准的金额范围内,并且对于出现的偏差给予及时的纠正,做好项目造价的控制与管理工作,确保管理目标的实现,使公路工程建设中人力、物力、财力得到合理的分配,最终取得良好的投资效益和社会效益。但是在工程实践过程中,公路工程造价的控制和管理工作还存在着许多问题:
2.1公路工程造价管理理念落后
多年来,受计划经济模式的影响,我国公路工程的造价管理观念落后,管理工作不能与时俱进,而是停留在定额的统一性、综合性、指令性和工、料、机价格的静态性的基础上,造价管理时不能全面反应市场的供求变化和价格水平,不符合现有的经济体制,这样既阻碍了施工建设水平的提高,也不利于人力、物力、财力等资源的合理分配,在一定程度上制约了我国公路交通事业的发展。
2.2公路工程造价管理重点偏离实际
现如今,在我国的公路工程造价管理过程中,工作重点偏向于施工过程,却忽略了项目前期的资金管理需要,实际上,公路工程前期工作是整个公路工程顺利完成的保障和前提,忽略工程前期造价管理不利于整个工程造价的统筹规划与管理,因此,公路工程建设全过程缺乏科学合理的造价管理规划。
2.3公路工程造价得不到后期改进
公路工程造价管理通常以前期图纸编制好的预算为主要依据,而在设计与施工过程中工程造价管理得不到合理优化,致使各个阶段的造价管理不能很好的衔接,工程报价管理工作贯穿公路建设的整个过程,所以工程造价的概预算不可能在各个阶段都做到完美,如果后期得不到相应的改进,则会影响公路工程造价管理水平。
2.4公路工程造价管理人员整体素质无法满足造价管理需求
我国工程造价管理工程师执业资格考试起步较晚,在整个工程造价管理人员中,70%以上的人员都没有获得证书,能够担当起这个过程造价管理的人员少之又少,所以公路工程造价管理缺乏高素质的人才。
2.5相关法律、法规不健全
我国已经出台了相关的法律法规,作为工程造价管理的依据。但这些法规还不够完善和健全。在许多项目的造价管理工作中,经常出现违规行为,工程造价管理工作较为混乱。
3公路工程造价管理措施
3.1改变观念,提高认识
工程造价的控制与管理,就是在投资决策阶段、设计阶段、建设项目发包阶段 建设项目实施阶段,把建设项目的造价控制在批准的限额范围之内,随时纠正发生的偏差,以保证项目管理目标的实现,力求在各个建设项目中能合理使用人力、物力、财力取得较好的投资效益和社会效益。
在加大公路投资的今天,工程造价的控制与管理已发展成一门独立的学科。首先,应探索在社会主义市场经济条件下的工程造价管理模式。在多种经济形式并存的今天,旧的以公有制为主体的造价管理模式,显然不能适应新形势的要求。由于风险不能共担,显失公平,承包商与业主之间的利益冲突也必然加大。因此探索市场经济条件下的工程造价管理模式势在必行。其次,公路建设的每一个阶段都存在造价控制,各阶段的造价控制环环相扣,这就要求我们应建立一套科学完善的工程造价管理体系,使工程的计价、审查、确定、结算、决算制度化,规范化,系列化,并建立一套强有力的监督、检查机制和奖惩措施。再者,如何合理地确定造价,使各种资源得到充分而合理的利用,以取得较好的投资效益和社会效益,实际上,这是对现在“重后期,轻前期;重决算,轻概算”的做法提出了质疑。把主要精力放在审核施工图预算和竣工决算上,算细帐,这样做尽管有一定的效果,但毕竟是“亡羊补牢”,事倍功半。因此要有效地控制造价,必须更新观念,将造价控制重点转移到建设项目的前期阶段上来,尤其设计阶段这个关键,未雨绸缪,以取得事半功倍的效果。
3.2合理确定,有效控制
公路工程建设是一个周期长、数量大的生产消费过程,由于各种客观因素的影响与制约,不可能在工程项目伊始,就能确定一个科学的、一成不变的造价。而是随着工程的开展与深入,使造价趋于合理,如估算、概算、预算、决算等的编制都是在不同的建设阶段完成的。因此工程造价合理确定与有效控制,应从以下几个方面入手:
3.2.1严格按基本建设程序办事
公路基本建设程序是公路建设工程客观存在的自然规律和经济规律所决定的。它不仅是优质、高速完成公路建设任务,获得较好的投资效益和社会效益的公路建设的科学管理方法,也是合理确定造价的科学依据。
公路建设项目,由于规模大,建设周期长,技术复杂,人财物消耗大,并考虑到投入使用后的经济效益等因素,一旦决策失误,将造成无可挽回的巨大经济损失。为了合理确定造价,必须在建设全过程进行多次性计价,即按基本建设程序合理确定不同阶段的造价,以充分体现造价的合理性。历史经验告诉我们,建设项目的程序化是合理确定造价的基本前提。
3.2.2以设计为重点进行全过程的造价控制
工程造价应贯穿于建设项目的全过程,但必须突出重点。显然,工程造价控制的关键在于项目的决策和设计阶段,而一旦投资决策后,控制工程造价的重点应放在设计阶段。因此,要有效地控制造价,必須做好以下几点:
3.2.1.1、实行前期阶段的监理制度
应该说这是一种较为客观公正的方法。通过设计监理的监督,使设计趋于合理,造价控制在限额范围内。反过来,也促使设计单位改善管理,优化结构,提高水平,真正做到“量体裁衣”。
3.2.1.2、积极推行“限额设计”制度
这是控制设计阶段造价的另一有效途径。实际上这不单纯是一个经济问题,更准确地说是一个技术问题。按结构的部位或功能的不同,将资金错分为若干单元,设计人员根据限制的额度进行设计。通过这种“限额设计”,能有效地控制整个项目的投资及造价,同时还可以确保重点项目的重点分项的资金投入。为推行“限额设计”必须解决设计中的技术总是有经验的设计师设计的成果往往经济而又实用;而没有经验的设计师的成果往往能用而不经济。
3.2.4项目实施过程中的造价控制
工程实施过程中的造价控制应有造价工程师来完成。fidic条款中赋予了监理工程师和造价工程师计量与支付的权利。因此造价工程师必须熟练地掌握和运用招标文件和合同协议书,抓住工程量清单和计量支付这个关键环节,认真审核承包商的每一笔支付申请,使资金能得到合理控制和正常的流动。
由于fidic条款在我国的推行,项目实施阶段的监理已日臻完善。但我国目前沿无造价工程师这一专职人员,使得造价控制不尽人意,目前项目实施过程中的造价控制只停留在工程结算这个环节上。造价工程师在项目实施过程中除了对所发生的各种费用进行控制外,还需要及时掌握国家有关工程造价方面的法律规定,收集各种价格信息,了解价格动态,分析整理各种造价资料等,显然,一般的工程师是难以完成上述工作的。因此造价工程师在项目实施过程中的作用是不可忽视的。
4结束语
综上所述,公路作为国家重要的交通基础设施,在建设过程中离不开高额的资金投入和高端的技术投入,如何控制和管理资金投入直接关系着国家财政支出和人们正常的交通出行,所以公路造价的合理控制和管理十分必要。本文针对现阶段工程造价管理的现状,探讨了公路工程造价管的相关策略。
参考文献:
[1]卞艳艳,高雪申,刘春秀.浅谈高速公路建设资金的有效管理[J].中国高新技术企业,2009(13):12-14
[2]余锋.公路工程项目的全面造价管理方法探讨[J].科技创新导报,2007,(03):13-15
[3]段辉敏.公路工程造价的控制与管理分析[J].交通世界(建养.机械).2011(01):32-34
[4]马茂军.浅谈如何加强公路工程造价的控制与管理[J].黑龙江交通科技.2011(05):22-24
关键词:公路工程;造价;控制管理;策略
Abstract: Highway construction cost management in the early stages of the project to the acceptance stage plays an important role, not only reasonable scientific cost management can bring considerable economic benefits for the construction unit, and can create value for society. In the highway construction cost management, to strengthen the highway construction project entire process and dynamic cost control, change the old idea and understanding, strengthen the cultivation of high-quality talents and improve the cost management, project cost management laws and regulations, perfect cost management system, to promote the development of highway traffic pressure in China, to achieve a win-win economic and social the interests.
Key words: highway engineering; cost; control and management; strategy
中圖分类号:TU723.3
公路工程造价的控制和管理至关重要,由于公路工程施工工艺复杂、周期长、项目大,且存在许多不确定因素,公路建设项目的整个过程都需要资金的投入,所以在造价管理方面存在很大困难,它是我国目前面临的一个特殊性的难题。科学合理的控制和管理工程造价是公路工程项目的重点,下面针对我国公路工程造价的管理现状,提出相关建议和意见。
1公路工程造价的控制和管理现状
近年来,我国市场经济体制得到了不断的完善,工程造价管理也加快了发展的脚步,取得了一定的成绩。公共工程项目从开始到项目验收,都涉及到资金的投入,整个过程中用于公路建设的所有资金就是公路工程的造价。2007年,我国颁布了《公路基本建设项目概算预算编制办法》作为公路工程造价管理的主要依据,但是在工程实践过程中,仍然出现很多问题,许多项目的造价管理工作没有严格按照相关法律规定,导致工程造价管理不规范。
2公路工程造价管理存在的问题
公路工程从项目决策到项目完成整个阶段的资金投入都应该控制在批准的金额范围内,并且对于出现的偏差给予及时的纠正,做好项目造价的控制与管理工作,确保管理目标的实现,使公路工程建设中人力、物力、财力得到合理的分配,最终取得良好的投资效益和社会效益。但是在工程实践过程中,公路工程造价的控制和管理工作还存在着许多问题:
2.1公路工程造价管理理念落后
多年来,受计划经济模式的影响,我国公路工程的造价管理观念落后,管理工作不能与时俱进,而是停留在定额的统一性、综合性、指令性和工、料、机价格的静态性的基础上,造价管理时不能全面反应市场的供求变化和价格水平,不符合现有的经济体制,这样既阻碍了施工建设水平的提高,也不利于人力、物力、财力等资源的合理分配,在一定程度上制约了我国公路交通事业的发展。
2.2公路工程造价管理重点偏离实际
现如今,在我国的公路工程造价管理过程中,工作重点偏向于施工过程,却忽略了项目前期的资金管理需要,实际上,公路工程前期工作是整个公路工程顺利完成的保障和前提,忽略工程前期造价管理不利于整个工程造价的统筹规划与管理,因此,公路工程建设全过程缺乏科学合理的造价管理规划。
2.3公路工程造价得不到后期改进
公路工程造价管理通常以前期图纸编制好的预算为主要依据,而在设计与施工过程中工程造价管理得不到合理优化,致使各个阶段的造价管理不能很好的衔接,工程报价管理工作贯穿公路建设的整个过程,所以工程造价的概预算不可能在各个阶段都做到完美,如果后期得不到相应的改进,则会影响公路工程造价管理水平。
2.4公路工程造价管理人员整体素质无法满足造价管理需求
我国工程造价管理工程师执业资格考试起步较晚,在整个工程造价管理人员中,70%以上的人员都没有获得证书,能够担当起这个过程造价管理的人员少之又少,所以公路工程造价管理缺乏高素质的人才。
2.5相关法律、法规不健全
我国已经出台了相关的法律法规,作为工程造价管理的依据。但这些法规还不够完善和健全。在许多项目的造价管理工作中,经常出现违规行为,工程造价管理工作较为混乱。
3公路工程造价管理措施
3.1改变观念,提高认识
工程造价的控制与管理,就是在投资决策阶段、设计阶段、建设项目发包阶段 建设项目实施阶段,把建设项目的造价控制在批准的限额范围之内,随时纠正发生的偏差,以保证项目管理目标的实现,力求在各个建设项目中能合理使用人力、物力、财力取得较好的投资效益和社会效益。
在加大公路投资的今天,工程造价的控制与管理已发展成一门独立的学科。首先,应探索在社会主义市场经济条件下的工程造价管理模式。在多种经济形式并存的今天,旧的以公有制为主体的造价管理模式,显然不能适应新形势的要求。由于风险不能共担,显失公平,承包商与业主之间的利益冲突也必然加大。因此探索市场经济条件下的工程造价管理模式势在必行。其次,公路建设的每一个阶段都存在造价控制,各阶段的造价控制环环相扣,这就要求我们应建立一套科学完善的工程造价管理体系,使工程的计价、审查、确定、结算、决算制度化,规范化,系列化,并建立一套强有力的监督、检查机制和奖惩措施。再者,如何合理地确定造价,使各种资源得到充分而合理的利用,以取得较好的投资效益和社会效益,实际上,这是对现在“重后期,轻前期;重决算,轻概算”的做法提出了质疑。把主要精力放在审核施工图预算和竣工决算上,算细帐,这样做尽管有一定的效果,但毕竟是“亡羊补牢”,事倍功半。因此要有效地控制造价,必须更新观念,将造价控制重点转移到建设项目的前期阶段上来,尤其设计阶段这个关键,未雨绸缪,以取得事半功倍的效果。
3.2合理确定,有效控制
公路工程建设是一个周期长、数量大的生产消费过程,由于各种客观因素的影响与制约,不可能在工程项目伊始,就能确定一个科学的、一成不变的造价。而是随着工程的开展与深入,使造价趋于合理,如估算、概算、预算、决算等的编制都是在不同的建设阶段完成的。因此工程造价合理确定与有效控制,应从以下几个方面入手:
3.2.1严格按基本建设程序办事
公路基本建设程序是公路建设工程客观存在的自然规律和经济规律所决定的。它不仅是优质、高速完成公路建设任务,获得较好的投资效益和社会效益的公路建设的科学管理方法,也是合理确定造价的科学依据。
公路建设项目,由于规模大,建设周期长,技术复杂,人财物消耗大,并考虑到投入使用后的经济效益等因素,一旦决策失误,将造成无可挽回的巨大经济损失。为了合理确定造价,必须在建设全过程进行多次性计价,即按基本建设程序合理确定不同阶段的造价,以充分体现造价的合理性。历史经验告诉我们,建设项目的程序化是合理确定造价的基本前提。
3.2.2以设计为重点进行全过程的造价控制
工程造价应贯穿于建设项目的全过程,但必须突出重点。显然,工程造价控制的关键在于项目的决策和设计阶段,而一旦投资决策后,控制工程造价的重点应放在设计阶段。因此,要有效地控制造价,必須做好以下几点:
3.2.1.1、实行前期阶段的监理制度
应该说这是一种较为客观公正的方法。通过设计监理的监督,使设计趋于合理,造价控制在限额范围内。反过来,也促使设计单位改善管理,优化结构,提高水平,真正做到“量体裁衣”。
3.2.1.2、积极推行“限额设计”制度
这是控制设计阶段造价的另一有效途径。实际上这不单纯是一个经济问题,更准确地说是一个技术问题。按结构的部位或功能的不同,将资金错分为若干单元,设计人员根据限制的额度进行设计。通过这种“限额设计”,能有效地控制整个项目的投资及造价,同时还可以确保重点项目的重点分项的资金投入。为推行“限额设计”必须解决设计中的技术总是有经验的设计师设计的成果往往经济而又实用;而没有经验的设计师的成果往往能用而不经济。
3.2.4项目实施过程中的造价控制
工程实施过程中的造价控制应有造价工程师来完成。fidic条款中赋予了监理工程师和造价工程师计量与支付的权利。因此造价工程师必须熟练地掌握和运用招标文件和合同协议书,抓住工程量清单和计量支付这个关键环节,认真审核承包商的每一笔支付申请,使资金能得到合理控制和正常的流动。
由于fidic条款在我国的推行,项目实施阶段的监理已日臻完善。但我国目前沿无造价工程师这一专职人员,使得造价控制不尽人意,目前项目实施过程中的造价控制只停留在工程结算这个环节上。造价工程师在项目实施过程中除了对所发生的各种费用进行控制外,还需要及时掌握国家有关工程造价方面的法律规定,收集各种价格信息,了解价格动态,分析整理各种造价资料等,显然,一般的工程师是难以完成上述工作的。因此造价工程师在项目实施过程中的作用是不可忽视的。
4结束语
综上所述,公路作为国家重要的交通基础设施,在建设过程中离不开高额的资金投入和高端的技术投入,如何控制和管理资金投入直接关系着国家财政支出和人们正常的交通出行,所以公路造价的合理控制和管理十分必要。本文针对现阶段工程造价管理的现状,探讨了公路工程造价管的相关策略。
参考文献:
[1]卞艳艳,高雪申,刘春秀.浅谈高速公路建设资金的有效管理[J].中国高新技术企业,2009(13):12-14
[2]余锋.公路工程项目的全面造价管理方法探讨[J].科技创新导报,2007,(03):13-15
[3]段辉敏.公路工程造价的控制与管理分析[J].交通世界(建养.机械).2011(01):32-34
[4]马茂军.浅谈如何加强公路工程造价的控制与管理[J].黑龙江交通科技.2011(05):22-24