土耳其东南部扎卜河上的哈克里水电站Ⅰ期工程最终设计正在进行,总装机容量208MW,包括一座高220m的分区式堆石坝。坝区处在一地震易发区。介绍了哈克里联营体为确定地震设计参数所进行的地震灾害调查和分析。
The final design of the first phase of the Haakery Hydropower Station on the Zab River in southeastern Turkey is under way with a total installed capacity of 208MW including a 220m high partitioned rockfill dam. Dam area in an earthquake prone area. This paper presents the investigation and analysis of the earthquake disaster carried out by the Hackney Consortium to determine the seismic design parameters.